Definitely old school thinking,16th applied arms length,but now ok?
 
That is why we have barriers to prevent access to live parts.
 
Starting to sound like DW Cockburn and his 415V shocks from frayed appliance flexes touching things while the suspended ceiling grid is live from faulty lights on another phase!
 
  • Like
Reactions: DPG and Strima
Don't know off hand but will check regs when back in the office.
May even be excluded in the 18th now but regardless of that, always seemed 'good practice' to prevent simultaneous contact!
And the 17th I believe
 
This is from the first 16th Ed (1991) and gives requirements for necessary notices. There is no Regulation prohibiting socket outlets in close proximity being on different phases.
20190330_140349.jpg
 
used to be, back in the day, (16th ed. i think) it was advised not to have 2 separate phase outlets within 6 ft. of each other. this went down the drain along with the "Danger 415v".
 
ooooops. posted before seeing last 10 posts.
 
  • Creative
Reactions: freddo
try telling this guy:
 
There is nowt in the 16th Ed which prohihits this. The common rule I suspect came about that if all accessories and equipment in a local area are common to one phase then the need for notices was not required.
 
Lighting used to be spread across phases to lessen the stroboscopic effect
I wouldn't have said that matters in office installations. With 3 phase, it's all about perception of moving or rotating machine parts. In offices it's 'flicker' problems and frequency modulation may come into play.
 
I wouldn't have said that matters in office installations. With 3 phase, it's all about perception of moving or rotating machine parts. In offices it's 'flicker' problems and frequency modulation may come into play.
I know, its mainly done in factories where there is moving machinery like lathes etc etc,

The most annoying thing in an office is the person with the bouncing leg as your monitor continuously wobbles.......
 
Being able to pick out the three phases in an office is useful for programming three phase equipment, for when there is no fork lift driver available to carry out the IBM AT with monochrome display to the shop floor that you’ve been supplied with to do the job.
 
Socket outlets simultaneously accessible when on different phases?
When the OP says different rings, I'm assuming he is referring to the socket outlets.
If he is referring to the actual cabling then maybe no problem.
But you can only plug one plug into 1 socket at a time, it's not as if you can play a monitor into 2 separate sockets at once and somehow put 400v through it. Is be very interested to hear a reg number also unless there's a hoover out there with 2 plugs hanging out of it I wouldn't worry
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread starter

cliffed

Arms
~
Joined
Location
Worcester
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Electrical Engineer (Qualified)

Thread Information

Title
Different phases in offices
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
33

Advert

Thread statistics

Created
cliffed,
Last reply from
MJPD29,
Replies
33
Views
7,619

Advert