Who's the contractor?
Working out in Accra in Ghana at the moment but work is due to finish here next month and looking for more overseas work.
Any info would be greatly appreciated
Sorry for not updating this yet. Haven't got the chance to get back to it yet.
The motor is to turn an auger for a feeder in a piggery. Their is also a hopper to incorporated into this system
which will has a sensor on it acting as an emergency stop.
Not sure whether or not I want to get...
Cheers for the replies.
The method above is exactly what I'm trying to achieve.
The Time Clock is switching the coil perfectly bringing it on and off
But the manual stay button will not hold the coil in and the stop button will not break the contact
The schematics provided by schneider have...
Sounds about right, wouldn't mind one of them fluke stray voltage adaptor test lead sets but I doubt it if it'll work with the megger, have been looking into getting a multimeter but I can't bring myself to buy one because I was always told they were for mechanics and such, when I was doing the...
Yeah he had isolated the emergency lighting circuit he was to work, however from what I remember the lecturer saying it was one neutral looped around every emergency fitting, on aluminium steps and boom down to ground. It was the fall that killed but the initial shock that caused the fall. Now...
Heard at story at a course I was on, borrowed neutrals on emergency lighting circuits in a factory, maintenance electrician changing a fitting and he got a shock fell off a set of ladders and died, could be lies but it was one of the head lecturer at the iet who told us
Tested with a megger 1730
The issue came about when I was about to carry out an insulation resistance test. The test couldn't be carried out as the test leads where picking up a voltage. Once all rcbo's where switched off each circuit tested clear > 999
Had heard of induced voltage was the...
How do I get rid of them!
Testing a job another contractor has been working on. In the main hall of the building there is a switch bank of 7 switches and 7 emergency key switches. Each of the switches are on a separate circuit. When I remove one of the lighting circuits from the rcbo I get 80v...
Take a look at the factory act 1895
These regulations have always been in place but have been chosen to be ignored mostly by architects and all knowing designers
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.