Do you know what,I am sure I saw one outside the garage but thought it was for the lights on the garage wall.
1599390742
I think you have just cracked it,will check its on the same circuit tomorrow. Thanks a lot,I really appreciate the advice
There is a switch with off, auto and over ride on it, the over ride on the switch makes the lights stay on no problem,but when I tested the over ride switch on the clock itself they only stayed on for a few seconds,so was wondering if that was normal.If they are staying on from the switch on the...
I meant it comes on for a few seconds then switches back off,Its brand new so would think its not sticking.I can't see it being a fault on the wiring otherwise it wouldn't stay on when I use the main over ride switch or would it only pick up the fault when you use the timeclock over ride,is...
Hi,I have fitted a timeclock throgh a contactor for some outside lights,and when I press the over ride on the time clock the lights only come on for a few seconds,then the contactor kicks,yet when I press from auto to over ride at the switch, they stay on, is this normal.I have read the...
I have been asked by the owner of 6 new units he has had built ,2 are 3 phase the rest single, His budget is maxed out so needs to know the minimum install he has to supply to start renting out and pull some money back
Hi,can anyone tell me what is the minimum a landlord has to supply in a small industrial unit, does he have to supply emergency lighting, fire alarm,hot water? or is that the tenants responsibility, or does anyone know where this information can be found,Thanks
He told me somebody came and told him to ask his neighbour if he could share his meter,I presumed it was the Dno,I will ask him on monday who he spoke too,not going near it if he doesn't have the proper permission,I was surprised when he said it because I thought the Dno would insist they did it...
Hi,I have been asked to install a 3 phase dipper tank 9.2 kw and a 3 phase heater tank 4.5kw,alas there is no 3 phase supply in the unit,the client says he has permission off the dno (I presume) and also has permission off the unit next door to share his 3 phase meter, I have never come across...
Hi , I am a bit confused on this one.Been asked to test a mobile cafe,(also have 2394 and 5) but am not a member of any of the above bodies, can I do it? and would it be acceptable to the council? Was thinking along the lines of an eicr. Any advice would be greatly received
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.