    Do I need to install an RCD for a Hypervolt EV charger

    Hi, Am I correct in saying I can install a single pole Type A 30ma RCBO to feed an Hypervolt EV charger? the supply cable is SWA and the Hypervolt has in built 6ma DC RCD protection. The consumer unit is a Lewden board so would ideally like to install a SP RCBO type A, any issues with this? its...
  2. P

    NICEIC Certification Scheme NICEIC assessment how do I notify domestic work before being registered?

    No problems, when I spoke to my assessor he advised me to notify the work after I got NICEIC registered. My assessor did check building control notifications. Good luck.
  3. P

    NICEIC Certification Scheme NICEIC assessment how do I notify domestic work before being registered?

    Will the assessor not check if the work has been notified on my assessment visit?
  4. P

    NICEIC Certification Scheme NICEIC assessment how do I notify domestic work before being registered?

    I spoke to NICEIC technical today and they didnt offer the 30 days to notify the work. I thought that was only the case if you are already registered?
  5. P

    NICEIC Certification Scheme NICEIC assessment how do I notify domestic work before being registered?

    Unfortunately the NICEIC wont except this as the Company would issue a certificate in their name not mine. its ridiculous that I can’t notify part P work with out being registered but I can be registered with out notified work in my name!!
  6. P

    NICEIC Certification Scheme NICEIC assessment how do I notify domestic work before being registered?

    Hi, looking for some advise please. Ive applied for NICEIC registration and I’m awaiting my assessment, my problem is that I’ve been advise by the NICEIC that the assessor will need to see 3 jobs on the visit and the certification needs to be in my company name. As any domestic work needs to...
  7. P

    VRI cables in old install EICR report

    Thanks for all your comments so far. I'm very aware that disturbing the wire could cause issues with the insulation crumbling. Also, I agree the likely hood of the conduit being intact with have been altered over the years is slim. I have inspected a a couple of points and the VRI cables seem to...
  8. P

    VRI cables in old install EICR report

    Hi all, I've been asked to carry our EICR reports on a large stately home. The house has around 20 C/U with around 15 circuits in each. All the wiring is VRI cable contained in metal conduit with no separate earths (conduit is being used as the earth). None of the C/U have RCD's fitted just...
  9. P

    Insulation readings

    Hi, I’m confused. I recently carried out insulation resistance test on a 3 phase board I had some weird readings. I removed all vulnerable bits of kit and tested the dead side of the incomer all readings where good a part from L2 which had a low reading of 2.8M ohms. This was much lower than...
  10. P

    AM2 Max Zs

    Cheers guys, I thought this was the case.
  11. P

    AM2 Max Zs

    ago Hi, I have my AM2 next week and I'm unsure if i should be using the Max Zs figures from BS7671 at 100% or the On Site Guide figures at 80%?

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock