Working towards MCS and just wondering what the situation is with the 'rest of the installation'.
If there's a spare way in an old board am i required to test any of the existing installation or do i need to worry about the new circuit only?
As an EIC will be issued for the new circuit i will be checking bonding etc is up to scratch.
Thanks...