Working towards MCS and just wondering what the situation is with the 'rest of the installation'.

If there's a spare way in an old board am i required to test any of the existing installation or do i need to worry about the new circuit only?

As an EIC will be issued for the new circuit i will be checking bonding etc is up to scratch.

Thanks...
 
you should at least check that the existing circuits are safe. any code 1 faults must be rectified or isolated, and other deviations recorded on your EIC ( IMO)
 
You are required to ensure that the existing installation is sound by doing a periodic inspection or asking for existing periodic inspection reports.

To be fair, I do this with any domestic job I do. If there are any code 1s, we are the only ones that ever going to find them and we're duty bound to bring them to our customers attention. You may even get a rewire out of it.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Periodic Required?
Prefix
N/A
Forum
Solar PV Forum | Solar Panels Forum
Start date
Last reply date
Replies
2

Thread Tags

Advert

Thread statistics

Created
Energetic,
Last reply from
Martin Dawes,
Replies
2
Views
1,610

Advert