Recent content by Andycots

  1. A

    Electrician Jobs Apprentice, mate

    Looking for either apprentice or mate in Wakefield area, own transport would be good, must be able to do multi trade jobs too. Pm with info for more details. Thanks Andy
  2. A

    Megger 1730 for sale

    Hi, is this still for sale Cheers
  3. A

    October 2391 - 301 written course aftermath!

    Yeah, did'nt look like the hardest paper i've seen for this exam, but never the less it's funny how you study your head off for week then turn paper over and, phoof, it's all gone. Andy
  4. A

    2931 Exam tomorrow, tips for next 24hrs

    Yeah Cheers all, check me other post out. Andy
  5. A

    2931 Exam tomorrow, tips for next 24hrs

    Hi, Exam day tomorrow and wondering best thing to be doing in prep, reading GN3, past papers or smoking like a gooden. Andy
  6. A

    IEE exam success

    Hi, Are the safe isolation procedures as indicated on page 50, 75, 77, 79, and test procedures acceptable in the exam, i would like to think so as thats what the books for, yes? It says nothing on page 50 about posting a notice. Also does GS38 only cover test equipment for live testing. Think...
  7. A

    2391 Practical passed

    Managed to pass the 2391 practical today at Wakefield skill center, hopefully find the theory on Thursday less stressfull. :annoyed: Andy
  8. A

    2391 Electricity at work regs

    Cheers Lenny So the answer is the full content of a,b,c even though it is only a 3 pointer. Andy
  9. A

    2391 Electricity at work regs

    Hi all Doing past paper and question is, "state 3 conditions that need to be met if work is carried out on or near live equipment, as identified in the EAW regs" Had a look a EAW reg 14 and still no wiser. Any help appreciated. Cheers Andy
  10. A

    GN3 queries

    Hi In GN3 it states that " all voltage sensitve devices to be disconnected or test between line and neutral connected together and earth", is this to prevent a for eg 500v being put through the device, as you are putting a dc voltage through the line and neutral together the circuit is not...
  11. A

    August 2391-10 taken today

    Congratulations to all who have passed, just hope C&G don't tighten the strings up with the higher pass rate, already nipping up a bit for myn in Oct. Well done all Andy
  12. A

    2391-10

    Cheers Richard Yes like you say it's understanding why the answers are correct, and the "answer what is required not what you think they want", is a good rule of thumb. Thanks again Andy
  13. A

    2391 october

    Hi all Doing my 2391 in Oct at Wakefield, where you debuting at Howard.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock