Hello, my first post!
I've lifted the floor boards in my Bungalow and found that there is a void between the rafters and a solid concorete floor. This area being ventilated by air bricks at both front and rear of the building.
Given the depth of the rafters drilling is not really an option .
So is it acceptable to just lay the T&E on the solid concorete floor between where I wish to bring the cables up behind the skirting board in oval conduit? If that is not acceptable for compliance to 7671 then in placing the T&E in plastic corrugated conduit laid on the concorete floor acceptable?
BTW I will be subject to a building regulation Inspection and I so I wish to get this right!
Thank you.
I've lifted the floor boards in my Bungalow and found that there is a void between the rafters and a solid concorete floor. This area being ventilated by air bricks at both front and rear of the building.
Given the depth of the rafters drilling is not really an option .
So is it acceptable to just lay the T&E on the solid concorete floor between where I wish to bring the cables up behind the skirting board in oval conduit? If that is not acceptable for compliance to 7671 then in placing the T&E in plastic corrugated conduit laid on the concorete floor acceptable?
BTW I will be subject to a building regulation Inspection and I so I wish to get this right!
Thank you.