B

brizospark

Guys,

Just wanted to see if I was around the right figure with this quote. Full Rewire, House Stripped back to bare bones, half the walls stone half are stud partition.

Price for labour only as the gear will be supplied


Let me know roughly how much you guys would be quoting, labour only mind

Lounge - Double Sockets 7
Lounge - Downlights 12
Lounge - Light Switch 2
Lounge - Wire and Connect Uplighter Kit 1
Study - Double Sockets 5
Study - Downlights 6
Study - Light Switch 2
Dining Room - Double Sockets 4
Dining Room - Downlights 12
Dining Room - Light Switch 2
Hall Lower - Double Socket 1
Hall Lower - Light Switch 2
Hall Lower - Downlights 4
Stair Lighting Kit - Wire and Connect 1
Upper Hall - Double Socket 1
Upper Hall - Downlight 8
Upper Hall - Light Switch 1
Vestibule - Double Socket 1
Vestibule - Double Socket 1
Vestibule - Downlight 4
Vestibule - Light Switch 1
Bathroom - Downlight 6
Bathroom - Light Switch 1
Bathroom - Extractor Fan 1

Bathroom - Extractor Fan Isolator 1
Bathroom - Shower Pump Spur 1

Ensuite - Downlight 6
Ensuite - Light Switch 1
Ensuite - Extractor Fan 1
Ensuite - Extractor Fan Isolator 1
Ensuite - Shower Pump Spur 1
Bedroom 1 - Double Socket 6
Bedroom 1 - Downlight 6
Bedroom 1 - Light Switch 1
Bedroom 2 - Double Socket 4
Bedroom 2 - Downlight 6
Bedroom 2 - Light Switch 1
Bedroom 3 - Double Socket 4
Bedroom 3 - Downlight 6
Bedroom 3 - Light Switch 1
Garage - Double Socket 2
Garage - Light Fitting 2
Garage - Light Switch 1
Utility Room - Double Socket 3
Utility Room - Light Fitting 1
Utility Room - Light Switch 1
Kitchen - Double Socket 6
Kitchen - Downlight 10
Kitchen - Light Switch 1
Kitchen - Grid Switch and Flex Outlet points for 6 x appliances/accent lighting 1
Install new consumer unit and upgrade meter tails 1
Upgrade equipotential bonding to gas and water services 1
Install 6mm SWA supply to garage 1
Install small consumer unit in garage 1


Install External Light x 8
 
What was your quote?

Without posting it, it makes it look like your trying to get someone to do it for you because you CBA lol.

Also, don't exepct many of the guys to announce their pricing strategies online.
 
  • Like
Reactions: 1 person
I am one of those that don't discuss pricing.

However, you're not that far off what i'd be charging. Probably doesn't help that lol.
 
The 'project developer' is supplying all kit I just have to give them a list of materials
 
would only do it on day rate. if i am not supplying the kit and it turns out to be wrong or not there on time or absolute rubbish you would be wasting your time and money being onsite with nothing to do, and they would not give a monkeys.

if i do not have control of the materials then its day rate with a minimum of three hours to be paid per visit to ensure they do not call you back time and time again because they are disorganised.

also ensure when the job is complete and their cheap transformers start to fail you will not be expected to come out and replace them for free!
 
  • Like
Reactions: 1 person
£4500 -£5000. then add 20% on top to cover being mucked about, and another 20% to cover your work being f***ed up by other trades.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Pricing Advice
Prefix
N/A
Forum
Electrician Talk
Start date
Last reply date
Replies
13

Advert

Thread statistics

Created
brizospark,
Last reply from
telectrix,
Replies
13
Views
130

Advert