can any one help i have to do a peroidic inspection on new property aprox 1 year old wired with a 17th mains the main gas bond is in place but the water bond is not. the incomnig pipe is palstic and then it changes to a metal stopcok and then to copper the copper then goes into the wall. it is also copper in the bathroom and also in the immersion cupboard.as there are still houses being built on the site i asked at the site office for more info on the instalation and was told that its a plastic pipe instalation .as i cant prove this with out pulling up the floors should i bond the water?
 
THe answer to that question wayne 1 is to test back to the Met with your R2 wander lead and if the reading to the pipework is less than 22kohms then its an extraneous conductive part and will require Main Bonding.------isolate any cpcs to immersion etc whilst testing.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
main water bond to plasic pipes with metal pipes visable
Prefix
N/A
Forum
Australia
Start date
Last reply date
Replies
1
Unsolved
--

Advert

Thread statistics

Created
wayne1,
Last reply from
sparkylad,
Replies
1
Views
2,034

Advert