• Thanks for visiting ElectriciansForums.net. We hope you find the information you are looking for. But if you don't manage to, please feel free to Register and ask a question yourself. You can delete your account at any time should you quickly find the answers to what you need.

construction

  1. Jason Philip

    Industrial Automation vs. Construction - career advice please

    Currently working as a control system technician focusing on installing wiring on conveyors and control panels, get 12.5 p/h and lots of work away from home. Have previously done residential / commercial & industrial installation electrician jobs. Am torn wether to go back to construction, for...
  2. R

    low power 110v~240v device on a construction site

    PoE details: Input: AC 100v~240v- 50/60Hz 0.3A max Output: DC 24v 0.5A PoE injector is used to convert mains AC into DC and power IP devices such as CCTV cameras and Wifi APs. These devices are designed for worldwide sale and are also widely used in the US and alike on 110v supplies. The only...
  3. L

    Medium size shop. Full concrete construction etc .Basement with 2 fire exits.Fire /smoke alarms?

    As title ! Single entry ground front door. twin stairs to basement . Each side of basement (It was knocked into one years ago) has its own fire escape etc . what would be the Basic level of Fire/smoke detection equipment that"should be required" for each of the 2 floors ? Thanks
  4. J

    employing 'casual labourer'

    Any sparks on here care to share any advice/past experience Needing the odd hand now I am getting little busier- can't see it being more than 5 days a month if that and not month in month out. laborer/mate is self employed (actually has his own business- but not as busy as me) wouldn't be...
  5. DuaneMHunt1976

    ECS

    I keep seeing jobs around that need ECS card, and years on the job! EAL Periodic Inspection, Testing & Condition Reporting of Electrical (2395) LCP Initial Verification and Certificate of Electrical Installations (2394) C&G2377-22 In-Service Inspection & Testing C&G2382-12 17th Edition Wiring...
  6. GB Construction Training

    Gb Construction Training

    Great Britain Construction Training are an independent training/assessment centre based in London and we can help you achieve the right qualification for the right job! We are a principal hub for all Construction, Electrical Training and development programmes. GB Construction Training is a...
  7. S

    working abroad

    Anybody out there had experience of dealing with Fluor when working abroad ?
  8. H

    Commercial 110v v 230v tools

    Hi Guys, Working in shops and offices. Company is insisting using 110v tools and where possible, battery equipment. I would have thought that 230v + 30mA RCd would be more than safe. Believe that the 17th edition relaxed the rules on 110v tools (55-0-55) Your thoughts gents please.
  9. M

    Domestic 110 volt

    Chaps I have just installed a 10 kva 110v site transformer on a job and put 3 double sockets in the garage for battery chargers etc I have had a request from the builder and the client to put temporary 230v standard 13 amp double sockets on each floor (i assume the builder dont have any 110v...
  10. La Poste

    Blacklist of construction workers

    I've just found this in the Sunday papers, shocking really. "Police are linked to blacklist of construction workers Security services 'gave data to clandestine organisation funded by major names in building industry" Police are linked to blacklist of construction workers | Technology | The...
  11. C

    Industrial Ecs card scam

    :nuke: Beware folks. There is a company who aparently come out top of the Google search list who are running a scam for electricians wanting ECS acreditation and cards. Some of my guys have been caught out. The company is www.constructionsupport.co.uk or Construction Support Line or...
  12. L

    Constuction site generator fed

    Anyone have any reference material (or know where I can get some) for feeding site distribution from a 3ph Generator. We have some on a site project & I would like to know more about how they should be managed. It's a 60kva 400v genset fyi
Top Bottom