Hi All,
I will be installing a dual voltage traffo to support a workshop.
The traffo will supply both 110V and 220V DB's that will both have their own circuits.
The customer has requested now that I install an extra 110V Industrial Skt to the existing 110v DB.
My plan is to install an...
Hi, first of all im new to this forum so apologies in advance for any mistakes regarding my post, just after some friendly advice.
Im looking to become an NICEIC Domestic installer and i have a few grey areas, obviously i dont want to make any silly mistakes that are going to cost me and effect...
So been working for a mate of mine for a while now and just had a query today..
I changing a consumer unit, and I told him I need an Adaptable box, some din rail and some din rail connectors to joint out the cables as they will be too small. He said just crimp them inside consumer unit.
Is...
I am carrying out the continuity for a ring final test for a single phase TN-S system. When doing the end to end Neutral I don't get a reading!! What is wrong here and what Code does apply (Code 1-3)?
Many Thanks.
nazoom
Thread
circuit
disconnected
final
neutral
question
reading
regarding
ring
ring final
Can we carry out the continuity test for the ring final by connecting the line, neutral, and cpc end to end at any socket or do we have to identify and disconnect the conductors at the C/U? I am aksing as i think it is much easier to link the line, neutral, and cpc end to end at any socket...
nazoom
Thread
circuit
continuity
easier
final
parallel
question
regarding
ring
ring final
socket
Hi I am trying to fill in PIR (Periodic Inspection and Reporting Cert.)for a single phase TN-S system.
I have one question in the section (Recommendation) it asks for the the installation is further inspected and tested by ........ What date do we put? If it was Unsatisfactory what do we...
nazoom
Thread
domestic
filling
installation
new
pir
question
regarding
years
Here's the full title:
"discussion regarding new industry initiatives regarding professional standards and support for electricians"
Anyone else had a call re this and asking if you'll agree to go on an Online Discussion Group early in July??
When filling the Condition Report Inspection Schedule For Domestic And Similar Premiss With Up to 100A Supply, section 5 (Final Circuits), the part that states: "Concealed cables in cooperating armour or sheath, or run within earthed wiring system, or otherwise protected against mechanical...
nazoom
Thread
cables
conduit
filling
new
pir
question
regarding
wiring
My test examination board is domestic (single phase) and has two Distributor boards (D/B), one the main one with the main switch feeding a sub D/B, and the other one is external (sub) distributor board with no main switch but they are RCD protected and is fed by the main D/B. My question is when...
I am trying to fill in the Condition Report Inspection Schedule for Domestic 100A. I have my exam coming up and having some problems filing the Section 6 of this form.
In Section 6 " Locations Containing A Bath or A Shower". My test Board (Domestic) has only a shower unit and no Shower Cubical...
I have a few questions regarding filling the Condition Report Inspection Schedule for Domestic 100A Supply.
1- On section 5 (Final Circuits) Is the SWA "Steel Wired Armour", conduit, and Trunking are part of these Final Circuits? or only the SWA?
2- 5.11 of Section 5 (Final Circuits)...
I have a question regarding filling the Condition Report Inspection Schedule For Domestic Up To 100 A Supply.
My question is when carrying out the inspection on my examination test board there is a shower Unit with its circuits but no shower cubical and there is no bathroom or bath basin or a...
Hi - is there someone who could kindly just summarise where we are with new installs from Jan to after April please in a concise format ie. what rate they will start on and continue with after certain dates and what other processes have to be undertaken such as an EPC
1. Solar PV fitted...
danesol
Thread
current
installs
new
new installs
regarding
situation
I have been in contact with my local AM about the need for a legal requirement for all rental properties to contain RCDs to protect against electric shock, she fully agrees with myself that this is a requirement which needs to be brought inline with the requirements that are imposed with Gas...
Spazz
Thread
change
properties
rcd
rcds
regarding
review
safety
these
Hi there guys
can someone tell me where is the best and cheapest place in london to get my 17th edition done. i got 16th so i need to do day refresher.
regards
George
Hi
I am bit unsure when carrying out dead polarity test on a one way switch and two way switch. Where do the test probes go and on what?
Do we make contact at the switch line and the cpc of a ceiling rose? or do we contact at the line and cpc at ceiling rose?
What happens in two way switch...
If I was the inspector When filling the Electrical installation Certificate under Declaration For Inspection and testing, I only need to sign this part? Also what do i put in the space for amended to ..?....(date) except for the departures, if any detailed as follows. What date goes in that...
nazoom
Thread
certificate
electric
electrical
electrical installation
filling
installation
question
regarding
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.