- Aug 30, 2011
- 641
- 492
- 137,226
- If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
- United Kingdom
- What type of forum member are you?
- Electrical Engineer (Qualified)
i have been tasked with inspecting , reporting and eventually remedial upgrades to our properties that have lightning protection systems.
im aware these need to be placed as near to the origin of the supply as possible.
some of these properties have sub DB,s .
i have added type 1+2 to some already, do the sub DB’s require SPD and if so what type?
im aware these need to be placed as near to the origin of the supply as possible.
some of these properties have sub DB,s .
i have added type 1+2 to some already, do the sub DB’s require SPD and if so what type?