guy wants a ground mount system (4KW) pre march 3rd.

He wants to add more modules down the line so asked if i could install a 3 phase inverter and meter now to make way for future.

Am i right in suggesting i install on single phase meter and inverter now, that way if Tariff does happen to meet 43p pre march, and he wants more added later it would work out better to add a separate array on another of the phases with its own gen meter that way he would get 43p for one array and 21p for the other?

Hope that makes sense?
thanks
 
He would get 43.3p for an ≤4kW system installed before 3/3. If it is extended after 3/3 then the new part would get paid at 16.8p if it fell into the 4-10 kW band (you have to include the first 4kW when you calculate that size) or only 15.2p if you go over 10kW in total.

How this is metered doesn't really matter. If there is only one meter the generation will get split across the tariffs.

Of course if DECC win their appeal to the Supreme Court then his first 4kW would only get paid at 21p.
 
Last edited by a moderator:

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread Information

Title
Leaving room for more modules post march 3
Prefix
N/A
Forum
Solar PV Forum | Solar Panels Forum
Start date
Last reply date
Replies
1

Thread Tags

Advert

Thread statistics

Created
infinity,
Last reply from
TedM,
Replies
1
Views
938

Advert