Hi All,

I've just been told by a local planning officer that a new set of rules concerning solar will be enforced from the 6th April. Unfortunately she said she did not have the new set of rules yet. Does any of you know know where to access them? How will our life change after the 6th April?
 
I have seen the draft today, it appears more for commercial.
They have taken down one hurdle by relaxing planning, but put up another by requiring an EPC.
Basically, this was as I understand it, on a commercial roof if you install and leave a minimum of 1m on all 4 sides, you can install under permitted rights, also on a flat roof you can install up to 1m from the plain of the roof.
Ted will put us right. (he beat me to it)
 
Has anyone thought through what the phrase, "..... on a roof and within 1 metre of the external edge of that roof;" means?

Is it effectively just the verge or hip (sides) rather than ridge (top) or eaves (bottom)?

Regards
Bruce
 
Well that's good news in a way - if it's just going back to a farmhouse built since the 30's with natural gas or a biomas boiler then it makes it easier.
 
I know, it's just ridiculous!

Anyways, what I don't understand is...after the 6th of april will PV on a block of flats with a commercial property on ground floor become permitted development?
 
Yes, as long as you meet all the other conditions that apply to permitted development.

Previously that would not have come under the definition of a block of flats, but from April 6th it will fall into the 'everything else' catch-all that is used in the new legislation.

Part 43
A. The installation, alteration or replacement of solar PV or solar thermal equipment on a building other than a dwellinghouse or a block of flats.

where the definition of “block of flats” is a building which consists wholly of flats.
 
Thanks Ted M, translating Legal into English is not everyone's piece of cake.

Local council here still say that we need to apply for planning, and they want to charge a small fortune for it:tearsofjoy:355! So I'd better wait until the 6th April and simply not apply!
 
what is article 1(5) land?

"(e) in the case of a building on article 1(5) land, the solar PV or solar thermal equipment would be installed on a wall or roof slope which fronts a highway;"

also, how did you find out about this, have i missed some communications? Isn't this something that our governing body should be informing everyone about??!?
 
Article 1(5) is a term that refers to National Parks, Areas of Outstanding Natural Beauty (AONB), The Broads, conservation areas and World Heritage sites.
 
This just applies in England at the moment.

It's also worth reinforcing that this applies only to "microgeneration" so systems over 50kW would still need planning approval.
 
...Still no update on Planning Portal and local council completely unaware of new rules! Any advice on how to prove that the new planning regulations are now applicable?
 
Just quote them "The Town and Country Planning (General Permitted Development) (Amendment) (England) Order 2012 SI 2012/748 coming in to force from 6th April 2012".

Scotland already has something broadly equivalent while Wales is still lagging behind.
 
We are looking at doing our first ground-mounted system under the new rules. We intend to go for a 4kWp similar to Solarcity's fine arrangement:

http://www.electriciansforums.net/p...gy-forum/54910-nice-pv-jobs-3.html#post503343

The new rules say: "The size of the array should be no more that 9 square metres or 3m wide by 3m deep."

Does this mean the surface area of panels or the surface area of land over which the array is based?

In the case of Solarcity's photo, assuming the panels are 1m x 1.5m, wouldn't his array cover 24 square metres?

Does this mean only a tiny ground-mounted array (approx 6 panels) can avoid planning permission, or am I missing something?
 
The panel surface can be 9m[SUP]2[/SUP] max with each side being 3m max - so yes not much more than 1kW under permitted development for a ground mounted array. This is the same for both domestic and non-domestic.
 

Reply to New planning rules from 6th April? in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

Similar Threads

I'm starting a new project on Monday, new dental practice conversion from a shop. Nothing new here, customer doesn't know what electrical heating...
Replies
12
Views
751
I was asked to see why a set of sockets weren’t working in the house (which appear to be a ring circuit based on breakers) There was no power on...
Replies
27
Views
1K
I'm fitting one of the Apex 7S units on Friday. I'd avoided the original range after a couple of bad experiences but I figured a new model might...
Replies
6
Views
800
Hi everyone, I just thought I'd say hello since I am new to this forum. I am looking for a complete career change and am set on becoming an...
Replies
6
Views
898
Hi, need some advice, I moved over from Sse in 2020 to Octpus energy. Whilst I was with SSE I was on E10 when I went over to octopus they put me...
Replies
1
Views
467

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock