May be a typo, but what is prefesional testingWhat test is to be conducted prior termination of 11 kV HV cable?
To add it would be a difficult procedure to test without first termination, you never know what damage could be done during the cable termination.Most certainly if that is the case then an Authorised person, or an Authorising Engineer fully trained with a current APicket should be carrying out the test.
What test is to be conducted prior termination of 11 kV HV cable?
It doesn't matter why.Why do you want to know?