schedule

  1. driverman

    test results form EICR

    Hi Guys, Taking 2395 exam shortly. Im just wondering on schedule of test results form what do I put down for size of cpc for MICC cable and for SWA cables if the armour is used solely for the cpc? I'm sure that somehow there must be procedure. Many Thanks Read more...
  2. driverman

    EICR schedule test result form filling

    Hi Guys, Taking 2395 exam shortly. Im just wondering on schedule of test results form what do I put down for size of cpc for MICC cable and for SWA cables if the armour is used solely for the cpc? I'm sure that somehow there must be procedure. Many Thanks
  3. L

    Use of cpc as a live conductor - EICR Coding

    Fella's I'm just writing up an EICR from last month, one of the findings was a lighting circuit on the non RCD side of the board where the cpc was used as a strapper in 2 way light switching, Ive marked it as C2 for two reasons, one being that there is no longer a cpc in the cable and also that...
  4. P

    Distribution Board Schedule

    Hi peeps. I have to produce a distribution board schedule for this 2 bed house, has got fire alarm system, burgular alarm system and the normal ring radial shower circuits etc This isnt a real job its for a assignment, stuck on this question Can any one help?? Thanks x
  5. N

    How to completed in PIR Schedule of inspection reporting?

    Hi I am having problems filling in the PIR (Schedule of inspection). Any examples on how to fill it in? May be an easier explanations on how to fill in the report? Or may be an example of one that is been completed already? Many Thanks
  6. Tuttle

    Reference Method - Schedule of Test Results - CU change

    Amendment 1 added a "Reference Method" column to the schedule of test results and while this makes perfect sense for new installs I am a little confused about what should be entered into this column for consumer unit changes, i.e. where you can't see all the cable runs so can't be sure what the...
  7. sparkymalarky

    Inspection Schedule Software/Building Services Software

    Hi lads and lassies, I recently started a new job as Inspection and Testing manager of a local company. One of my tasks is to keep an eye on previous PIR's/EICR's and when they are due for 're-testing' to generate work. I was wondering if any of you have come across software that would notify...
  8. S

    schedule of inspections help

    Just a quick question, in the general section of this form, 1. presence of under voltage protective devices, there are passive rcds on the cu and no dol starter, I've put n/a for this 2. Connection of single pole devices for protection or switching in line conductors only, all sockets used...
  9. R

    Electrical Installation Certificate - Schedule of Items Inspected and Tested

    Hi guys, Does anyone have a copy of the Schedule of Items Inspected and Tested explained in more detail? Any reply would be appreciated. Thanks
  10. C

    zs and Ipf at d/b on schedule of test results

    hi all just a quick question about the above title,go easy with me if i am missing something obvious here lol, why do you have to put zs at d/b on the eicr(got a copy of part p doctor and on his sample of schedule of test results he as put the ze figure in there and then put ze in brackets at...
  11. S

    Schedule Of Results

    Hi guys, just a quick one. Is there a 3 phase schedule of results when the board is used to supply single phase circuits only? I've got a feeling that I've seen a Robin schedule where the 1st column was the phase number (1,2 or 3) and covered a number of circuits. Thanks in advance. Steve.
  12. N

    Question regarding filling in the Schedule of test results. Please Help.

    Hi I am trying to fill in a Schedule of test results for a domestic installation. I have one question: When filling in the the sheet under the section Overcurrent protective device what goes in the "Type" part? Is it acceptable to just say TYPE B or do i have to get the whole number like B...
  13. B

    Schedule of Inspections

    My second post coming up and once again a 'hypothetical' that could become reality shortly... Install a radial socket circuit in a garage supplied from a spare way in the consumer unit (RCD protected), all tests ok. 1. Presumably this requires a EIC and associated Schedule of Inspections? 2...
  14. A

    Schedule of Test Results (No 18: Zs) Calculation

    The SOTRs gives a column 18, for the Zs of each circuit. Does anyone have the workout/formula for this?
  15. S

    New Consumer Unit - Generic Schedule of Test Results - Reference Method

    Just trying to get something straight in my mind. I've been looking at the Electrical Safety Council's Guidance 6 for changing a consumer unit in a domestic premises. They say that if the customer does not wish for a full EICR then the pre-work survey required before the CU change should...
  16. G

    Apartment Load Schedule - Safe?

    I'm just about to move into a new apartment in the Philippines. I know the electrical code here will be different here to that in the UK, but if you could tell me if it's safe, or whether we're all going to burn to a cinder, that would be a great help! :) I've attached the load schedule. I'm...
  17. W

    Condition report schedule for industrial premises

    Has anybody got a sample of, or whats different in an Industrial Condition report inspection schedule, as most samples I've seen are suitable for premises upto 100A supply.
  18. SJD

    Couple of EICR schedule of test results questions

    Being relatively new to EICR testing, I was not totally sure how best to enter a couple things found on an old house periodic earlier this week, and would be grateful for opinions. 1. For a single 13A socket that had been connected as a spur at the fuse board (with 2.5mm2 cable) to the wrong...
  19. N

    Questions regarding Filling the Condition Report Inspection Schedule for Domestic100A

    I have a few questions regarding filling the Condition Report Inspection Schedule for Domestic 100A Supply. 1- On section 5 (Final Circuits) Is the SWA "Steel Wired Armour", conduit, and Trunking are part of these Final Circuits? or only the SWA? 2- 5.11 of Section 5 (Final Circuits)...
  20. N

    Question regarding filling the Condition Report Inspection Schedule. Please Help.

    I have a question regarding filling the Condition Report Inspection Schedule For Domestic Up To 100 A Supply. My question is when carrying out the inspection on my examination test board there is a shower Unit with its circuits but no shower cubical and there is no bathroom or bath basin or a...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock