Visual inspection of the lead
Continuity of conductors
Insulation resistance

Are you PAT testing them?
 
Not sure you will get the correct advice on a UK forum.
 
  • Agree
Reactions: 123

Attachments

  • Optimistic
Reactions: 1 person
We have them at work , buy the scafftag type label for test dates they tie wrap on and are very hard wearing
Give it an I d
Visual check , must have metal braiding if on construction site or engineering shop floor etc (type 7 cable) or sy which we like for portable equipment ( some people don’t like to use )
Continuity tests
Ins resistance
Fill out ppm sheet
Store in folder or on pc
Job done ✅
 
  • Dislike
Reactions: jamie-spark
Also,check for correct configuration,as a lead with a male type plug at both ends,could pass inspection,in regard of how it is fitted.

Industrial sites are notorious,for "modified" leads,with the 110/240 16A "universal-with-the-nib-removed" being common :)

Just noticed where the OP is...gonna be a voltage drop,to there :)
 
  • Like
Reactions: Dozer 73
Also,check for correct configuration,as a lead with a male type plug at both ends,could pass inspection,in regard of how it is fitted.

Industrial sites are notorious,for "modified" leads,with the 110/240 16A "universal-with-the-nib-removed" being common :)
That old chestnut
 
We have them at work , buy the scafftag type label for test dates they tie wrap on and are very hard wearing
Give it an I d
Visual check , must have metal braiding if on construction site or engineering shop floor etc (type 7 cable) or sy which we like for portable equipment ( some people don’t like to use )
Continuity tests
Ins resistance
Fill out ppm sheet
Store in folder or on pc
Job done ✅
As written in electricity at work act
Keep records of electrical equipment that may cause harm and keep in safe working condition
This is how we comply with national grid , united utilities etc
And we get audited on this to make sure we are complying
 
We have them at work , buy the scafftag type label for test dates they tie wrap on and are very hard wearing
Give it an I d
Visual check , must have metal braiding if on construction site or engineering shop floor etc (type 7 cable) or sy which we like for portable equipment ( some people don’t like to use )
Continuity tests
Ins resistance
Fill out ppm sheet
Store in folder or on pc
Job done ✅
The dislikers what do you suggest
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
3 Phase Leads
Prefix
N/A
Forum
Electrical Testing & PAT Testing Forum
Start date
Last reply date
Replies
9

Thread Tags

Advert

Thread statistics

Created
Graeme,
Last reply from
Dozer 73,
Replies
9
Views
2,052

Advert