G

GDF144

I’ve been offered a full rewire and consumer unit change, in the guidance note it says all notifyable work should be reported to building control or done by a person who is signed upto a competent person scheme. My aim is to sign upto a scheme eventually, I’ve done a domestic installer course and I’m a commercial fire alarm engineer for the last 8 years. How do I build a portfolio of work for a NIC/Napit etc to come and assess without having building control come and check every job? Any feed back would be appreciated. Cheers
 
How do I build a portfolio of work for a NIC/Napit etc to come and assess without having building control come and check every job
they want do that, you need to be part p or do third party .
 
  • Like
Reactions: ruston
Start the job , mid way through the job book your Nic or Napit assessment.
Try to time it so that the job finishes just In time for the assessment.
you can always fudge the dates a bit (but you didn’t hear this from me)
 
  • Like
Reactions: GDF144

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Notifiable work before joining competent person scheme
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
3

Advert

Thread statistics

Created
GDF144,
Last reply from
Dustydazzler,
Replies
3
Views
1,520

Advert