Hi All I'm new here. I have just finished my NVQ and waiting to do my AM2. I have a question on selectivity as it has always slightly confused me, as I've never seen it practically since I started.

My question is will selectivity be achieved if all boards were RCBO's and not RCD's as If there was a problem on a circuit then only the corresponding RCBO would trip and not go in series right? I want to add power to a couple of out buildings (1.workshop shed and 2.Log cabin) both with sockets and lights one with air con. I will be upgrading the main consumer unit (No.1) from a split load RCD to a RCBO Consumer with SPD. and feed the Log cabin (consumer unit 2) from a 63amp RCBO. and the feed the shed (Consumer no.3) with a 50 amp RCBO. will this work??

My Apologies in advance if its a stupid question.
 
Both of those seem a bit high… what is the design load of each outbuilding and distance from CU?

What is the installation method running out to each building?
depending on method, you could use an mcb to protect the cable, and an RCBO for each circuit within the outbuildings.
 
The thing to understand about selectivity (aka nuisance tripping) is that you have to decide what it is that you want to 'select' - current (for one assumes ADS purposes) or earth leakage. By using an RCBO you're then dealing with both at the same time.

To use some extreme figures just to illustrate...
If I have a circuit which is a 400A MCCB feeder supplying a sub-board which only contains a single 6A MCB powering a light, it should be easy to see that if someone smashes the lamp glass that the local 6A device will trigger faster than the 400A one (under normal conditions). So we have 'selected' that we want the 6A MCB to trip before the 400A one upstream.

However, lets use the same arrangement and say there's RCD's involved. Our 400A feed is now being backed up by an RCD because some Idiot buried the cable in a wall (hypothetically, obviously!). And at our sub-board we've installed a double socket on a 20A RCBO. The RCBO has to be 30mA rated by regs and adhere to a maximum disconnection time of 300mS.

We now need to add some maths - let's say that the Zs at our double socket is 1Ω and our actual measured voltage is 230v - we therefore have a maximum prospective earth fault current of 230 / 1 = 230A.

Going back to our socket, the same Idiot that buried the cable in the wall also mounted the plastic socket right on the corner where the forklift backs up and it's been totally smashed, maximum effort. So now there's a mashed up Live conductor pushing 230A straight down the cpc. The 400A MCCB upstream isn't bothered about it, that's barely half it's design load for current - so selectivity (1) is that the overall sub-board has stayed on, so we can at least see what's going on because the light is still working.

Now we have to consider our RCD's. In reality in our scenario the MCB (current) component of our RCBO in the sub-board would trip regardless under ADS times, so lets say for arguments sake that the smashed socket isn't creating a dead short, it's just dangerously close and the same Idiot that installed it comes along to take a look and grabs it, making a circuit with their hand. Shocking, but we shouldn't be surprised. From the current/time tables in BS7671 we know that a type C 20A RCBO will take a theoretical 100mS to activate on over-current (and our Idiot has exceptionally thick skin), so we'd expect the max 30mA protection to make the device trip on earth leakage instead, yes? Well.... maybe. Remember that RCD we had to install to back up the MCCB? It's also 'seeing' exactly the same fault - an imbalance and leakage onto the cpc. So we now have two RCD devices seeing exactly the same 230A of fault current through them - at this point it becomes a game of chicken as to which will trip first - because - even though the device we installed at the source was rated at say 300mA max current leakage (hypothetically, as that wouldn't actually be an allowed figure for a buried cable, but let's run with this....), obviously that's a lot lower than our 230A of earth fault, so that doesn't actually count. What matters in this situation is TIME (something our Idiot with their hands on a smashed socket doesn't have..) Let's assume that both RCD's are 'standard' with maximum times of 300mS, but they're different makes and have different tolerances (realistically, we'd expect both to have times of under 150mS). It turns out that the 300mA device trips in 50mS, and the 30mA RCBO trips in 69mS. So now, whilst Idiot is nursing their shocked hand and bruised ego, they're doing so in the dark because the upstream device has isolated the entire sub-board. Also, if we come along and reset it, there's still a live smashed socket to deal with and an Idiot nearby.

What we really wanted to happen was for the 20A device in the sub-board to trip and take care of protecting the situation whilst leaving the lights on. So our selectivity (2) here is by using an upstream RCD device that we know will stay 'up' long enough for the downstream devices to react. We do this normally by using either time-delay (S type) or fully time-adjustable electronic devices.

For this reason, RCBO's are great for final circuits, but generally avoided on any circuit servicing other ones!
 
Last edited:

Reply to Selectivity RCBO Board in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

Similar Threads

Hi guys, I have supplied my Shed with a 6mm SWA cable into a nice consumer unit. In there I have a 6Amp MCB for the lights and a 16 A supplying a...
Replies
25
Views
948
NICEIC Certification Scheme BS7671 Amd2 Cert completetion RCBO's
hey guys, Just completing an install cert for a new consumer unit and im a bit confused on PD selection. I install Type A RCBOS but on the new...
Replies
2
Views
1K
Hi all, Grateful for your expertise regarding my confusion on the below. Context: French rural domestic property Single phase supply, TT...
Replies
12
Views
2K
I have a small Consumer Unit fed from a 6 amp type B mcb to a 6 amp type B,it only feeds 1 light in a bin store . clearly we have no selectivity...
Replies
7
Views
588
Hi, I recently had an EICR done at my property which unfortunately was unsatisfactory. So the electrican advised a new fuseboard from BG General...
Replies
90
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock