Recent content by steve100

  1. S

    Capping

    Thought lime would, but general plaster, would this not deteriorate the off over time?
  2. S

    Capping

    Can someone please clear up a query I have in relation to capping and the reason for… I was taught that you capped to protect the cables from the plasterers float then plastering, however following a discussion at work there was a consensus that it was to stop the chemical reaction between...
  3. S

    MCB's - I2 ≤ Iz1.45

    Can anybody help me with this......I understand the concept of the equation I2 ≤ Iz1.45, however what I’m not sure about is how we obtain I2? The way I understand it could be either by multiplying In by 1.45 or multiplying In by 5 (which would be the worst case scenario of the MCB’s tripping...
  4. S

    Spurs Off Ring Final Circuit

    I have a query around installing a socket outlet spur off a final ring circuit in a domestic installation which isn’t protected by any RCD’s at the DB. My understanding is that to comply with the current regulation the cable installed in the wall would need to be in the prescribe zones (which it...
  5. S

    Installation Reference Method

    Hi What is the installation reference method for flat T&E cable, with capping and buried in plaster, am I correct in thinking it is method C as all the others in table F6 (page 150) in the OSG refer to insulation? Steve
  6. S

    Adiabatic Equation

    Thanks, this makes sense now. Can i just ask one more thing, I also read somewhere that the PFC must be higher than the current required to disconnect the protective device, is this correct? Is this part of the equation process, as I thought this was established through meeting the required Zs...
  7. S

    Adiabatic Equation

    I am trying to get my head around the Adiabatic equation and was hoping that someone could check my understanding? I know the equation is S = √I² x t/k S = the CSA of the CPC I = the PFC which is calculated from Uo/Zs t = now this is where I get a little confused, my understanding is...
  8. S

    Emergency Switching

    We are currently looking a Switching in our 2330 L3, can someone please advise me as to whether an Emergency Switch is an on or off load switch? As it is a normally closed contact and carries current I thought it was an on load switch because it is required to cut off the full load current, but...
  9. S

    Prospective Earth and Short Circuit Current, Earth Fault Impedence

    Thanks everyone:stooge_curly:
  10. S

    Prospective Earth and Short Circuit Current, Earth Fault Impedence

    Hi Thanks, so I prosume that the impedence for both 3 and 4 should be low so that the high current flows to operate the protective devices in time? Also, can you tell me what is the difference between an earth fault and a fault between line and earth? Cheers
  11. S

    Prospective Earth and Short Circuit Current, Earth Fault Impedence

    Hi I'm curent sudying for my 2330 and we have starting looking at the above, however I getting a little muddled/confused. Can someone please help me with some definitions and the us of the following, why we look at them? Prospevtive Short Circuit Current? Prospective Earth Fault Current...
  12. S

    Transmission

    Hi Could someone please help me to confirm the transmittion volages across the grid, my understanding is 400kV and 275 kV - super grid 132kV - natioanl grid 66kV and 33kV - secondary grid 11kV for local sub stations industry 400V for commercial 230V for domestic I have also heard that...
  13. S

    R1 & R2 Testing Help

    Thanks for the reply, please bear with me, I have done some testing but still not sure as to why the R1 + R2 readings on a ring are similar/same at each socket? But on a radial they are different? Do you cross connect the line and cpc to ensure a complete ring when testing R1 & R2?
  14. S

    R1 & R2 Testing Help

    Just started testing at college and not sure of the following in regards to the R1 + R2 testing: 1. Why are the readings in a ring the same or similar? Compared to radial? 2. Why do you cross connect line and cpc in a ring to carry out the R1 + R2? Thanks Steve
  15. S

    Formula Calculations Help!

    Thanks for this, had a go not sure if its right, but at least i tried.....

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock