Just wanted to know how everyone else carrys out the paperwork side:
This is the way i do it
P.S - Do any of you go back in 12 months to check the system?
Just wanted to know how everyone else carrys out the paperwork side:
This is the way i do it
- Send Estimate
- Then site survey
- Follow up with formal quote which gets signed and forms the "contract"
- (internal proceedure) Create job card and order good etc
- Do the install
- Come back and create the Hand over Manuel -This is the bit im unsure of: Do you guys go back and Hand over the manuel or do you take it to site and complete it on site? but if you do im not sure how you would? Or do you post it to them and talk through on the phone? or just post it and not talk about it?
P.S - Do any of you go back in 12 months to check the system?