Discuss Need Answers to these questions PLEASE HELP in the Electrician Courses : Electrical Quals area at ElectriciansForums.net

mani

-
DIY
Reaction score
0
1. List where you test on a 3 phase and neutral installation to confirm Safe Isolation?

2. What documents are required for a new installation, who is responsible for determining next test and who the forms are given to?

3. Sketch layout of a TN-C-S domestic intake position? Page 15 in OSG

4. You are testing Earth Fault Loop Impedance on a TT system.
Why is it necessary to isolate the installation before testing?
What do you have to do with the earth conductor before testing?
Why can reading be recorded as the electrode value?

5. Ohm meter giving incorrect reading.
2 methods to verify?
What do you do if faulty?

6. Identify 3 factors which can affect the time taken to complete an installtion?

7. You are working onsite for a few weeks
Suitable storage for tools/equipment?
Precautions for materials onsite?

8. 3 methods to make area safe before starting work?

9. You had to draw a diagram for a an earth fault loop path for a TN-C-S system for a fault on a fixed load within the installation.

1. describe reliationship between-
A.supplier to main contractor
B. client to consultant
C.main contractor to sub contractor

2 balancing load they gave you 9 different currents and said balance them over 3 phases

3.compare cable avdantages and gave 6 cables

4. draw a diagram and explain polarity testing

5.rcd trip test values and times

6 describe onload and off load switching


that some i can remember
Q1 Describe THREE work activities, related to the building fabric which may be undertaken when installing steel conduit and trunking in a new brick and steel frame workshop.
B) List THREE materials which may be required for remedial work following the rewiring of domestic premises, with concealed wiring and flush accessories.

Q2 State the term used to describe a formal document which sets out the terms of an agreement between two parties.
B) List TWO steps that would be involved in making such an agreement between a main contractor and an electrical contractor.

Q3 List THREE categories of switching identified in BS 7671.
B) Describe briefly the purpose of each category you have listed.

Q4 List THREE different types of overcurrent protective device.
B) State THREE factors which would influence the selection of a protective device.

Q5 List THREE requirements of BS 7671 relating to installed electrical equipment to be verified during the inspection process.

Q6 List THREE relevant documents which may assist the inspection and testing process.

Q7 Identify TWO items to be checked by a visual inspection prior to commissioning an installation, containing EACH of the following
a)trunking
b)cable tray
c)conduit

Q8 List THREE checks to be made to verify a test instrument for safety and accuracy prior to use.

Q9 Whilst carrying out an insulation resistance test on a new lighting circuit the result is unsatisfactory. list THREE steps which need to be taken.

Q10 List THREE documents that MUST be produced following the inspection and testing of a new electrical installation.
B) List the THREE areas of responsibilty which require signatures on the document.

Q11 Describe briefly how to carry out a continuity test of a main equipotential bonding conductor on a new installation prior to the connection of supply.


 
2. What documents are required for a new installation, who is responsible for determining next test and who the forms are given to?

Electrical Installation Certificate, Schedule of Inspections & Schedule of Test Results.
The Designer dictates the very first periodic inspection.
The person ordering the work.

all this data is in there.... have a closer look...
 
Last edited:
Have you made ANY effort to answer these?

You learn as you seek out the answers, picking up other information as you search books etc.

Give it a shot and post what you're stuck on, not just an entire exam paper.
 
Have you made ANY effort to answer these?

You learn as you seek out the answers, picking up other information as you search books etc.

Give it a shot and post what you're stuck on, not just an entire exam paper.

Need help on this question:

Describe THREE work activities, related to the building fabric which may be undertaken when installing steel conduit and trunking in a new brick and steel frame workshop.
 
Need help on this question:

Describe THREE work activities, related to the building fabric which may be undertaken when installing steel conduit and trunking in a new brick and steel frame workshop.

Is it me or do these questions get more vague ok

1) Drill and rawlplug brick to secure containment system

2) Bonding of the steel frame of the building to the MET

3) Use of girder clips for securing containment system

Not sure if these are any where near right but hopfully will at least help
 
Is it me or do these questions get more vague ok

1) Drill and rawlplug brick to secure containment system

2) Bonding of the steel frame of the building to the MET

3) Use of girder clips for securing containment system

Not sure if these are any where near right but hopfully will at least help

Thanks for your help.
 

Reply to Need Answers to these questions PLEASE HELP in the Electrician Courses : Electrical Quals area at ElectriciansForums.net

Similar Threads

I have got these questions on 2391-52 inspection and testing but can't remember option of 1st two questions. Please any suggestion will be...
Replies
2
Views
661
Refurbishment of dwelling has taken place and the clients insurance company requires a periodic inspection and test to be carried out, A new...
Replies
18
Views
1K
Guidance please - C&G L3 electrical installation - Hotel extension project Hi folks, I am fairly new to this forum but it looks like the...
Replies
6
Views
689
Hello, Looking for some advice following a botched 3 phase upgrade today. Some background: Commercial unit originally fitted out (4 years ago)...
Replies
7
Views
579
Hi all, New to the forum. I have been asked to look at this for one of our guys who's had an issue onsite after some electrical works had been...
Replies
4
Views
742

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock