I "recently" contacted my DNO to have an isolator switch fitted beside my meter (my consumer unit needs changing and I didn't want to pull the fuse). I was told I needed to contact Scottish Power who charged me £85 but failed to turn up for the appointment, resulting in me having to contact them to ask what had happened. A new appointment was arranged for 2 & a half weeks ahead (the same as if I had newly requested it).
This happened 4 times!!! The work was eventually done at the 5th attempt. Each time I got no confirmation of the appointment & I had to queue on the phone to inform them that nobody turned up & arrange a new appointment. The 5th occasion was slightly different in that the complaints team were to get back to me regarding a new appointment, but never did. It wasn't till I chased them I discovered an appointment had been booked (without checking with me as to whether I would be available)!
After the 2nd missed appointment I was advised that I was entitled to a £30 statutory payment, so of course I asked about the 1st and eventually got a payment for that also. So I have had 4 missed appointment payments plus another for a late payment. £150 in all.

It turns out that Scottish Power don't do the work themselves but sub-contract it to Actavo and the lines of communication between them are poor, involving more phone queueing & long waits. Actavo are more used to dealing with meters and the Engineer who came out had never fitted an Isolator switch to an existing installation before and didn't know what to do (I gathered he wasn't actually an Electrician). He spoke to his boss on the phone who told him he couldn't do the job, but was overridden by the next person up the line who said of course they could do it. Someone had to talk him through what to do after he sent them a photo of the setup, but when he sent them another photo after he had finished, was told to change it.
I should also mention I had offered to de-load the consumer unit for the "engineer" when he was ready, but he just came in & turned it off at the main switch without de-loading first.

I booked the work in August and it was completed towards the end of November. So if you need an Isolator switch order it well in advance! Also when you are queueing on the phone to Scottish Power you are told you can track complaints online, but the complaint tracker page never had any information that was remotely useful over the whole period so don't rely on this.

The moral of the story seems to be that although the regulations say you shouldn't pull the fuse, the operators are not at all geared up to fit isolator switches and on this showing I wouldn't rely on them turning up on the day you want to do the work to pull the fuse either.

I do wonder if the Actavo "Engineers" had been avoiding my job as they didn't know how to do it.
 
I'm sorry to hear this, its a total nightmare from your perspective. From what you've said I'd also be checking the tightness of any new connections they've made.
In my humble opinion ... claim back all the money you can and submit a written complaint about inconvenience and delay. I'm not sure how they can possibly think this is anywhere near the ballpark of acceptable service. But nothing will change till there are sufficient costs and complaints.
 
  • Like
Reactions: Dave OCD and DPG
And these companies wonder why electricians pull the fuses themselves.
 
We are far better trained equipped and qualified than most of these so called engineers yet we rely on them to make connections we can't see or check to see of they are sound it's all a bit of a joke really
 
When I moved into Casa del Wilko a few years back I noted there was no fuse seal, a status I'm in no hurry to rectify.
 
  • Funny
Reactions: 1 person
Client of mine requested Scottish power to fit an isolator so we could change the board. Nobody turned up on the day and chasing up SP they said they no longer fitted isolators...
So OP posting disappointing but not surprising....
 
next time get your customer to arrange it for isolator to be put in .if not pull the bl**dy fuse. the last time I changed the consumer unit
the suppler turned up to pull the fuse he put on his bomb proof suit to pull the fuse .what!
 
  • Like
Reactions: 7029 dave
I saw Western Power fit an isolator - as you say he put on his bomb-proof suit and helmet to carry out the work...Consumer Unit wasn't even fitted so no load whatsoever... He wasn't a qualified electrician either!
 
I just gotta get myself into this "fit an isolator" malarky
It might just be age that makes me different to you modern breed

If I was approached,the isolator would be fitted,the job would be cheaper than those engineer people, and no worrying about broken seals,they can stay intact :)

It does amaze me that electricians actually pay to have these fitted by someone else :confused:
 
..These so called engineers yet we rely on them to make connections we can't see or check to see .....
...Passing some current , and a FLIR ?
-- or feel for heat with cautious back of hand..eeek

This is brought about by "LEGAL" requirements .
Insurance liability rules ..... (protecting Job as well)
(and a poor grasp of implications of SAID -Rules )
... It was saving them money -"That way" ...I imagine ....
 
I phoned eon yesterday and told them that I had an installation that needed urgent work and I needed the supply isolated prior to the 4th December, they said they couldn't do it until the new year but if the house owner called they may be able sort something out. I told them that if they didn't turn up prior to me attending I would pull the fuse to comply with the electricity at work regulations. My customer then called them and they said to him that if your electrician feels it necessary to pull the fuse then tell him to go ahead and do it!?:-)
 
I saw Western Power fit an isolator - as you say he put on his bomb-proof suit and helmet to carry out the work...Consumer Unit wasn't even fitted so no load whatsoever... He wasn't a qualified electrician either!
The majority of dno staff are not 'qualified electricians', why would they be? Western Power want staff knowledgeable about the network, their responsibility ceases at the cutout.
They do a lot of work live, they are only putting on the safety equipment they are obliged to wear. Saves getting injured and/or sacked
 
They do a lot of work live, they are only putting on the safety equipment they are obliged to wear. Saves getting injured and/or sacked
yeah ,like something like the hurt locker!
 
I phoned eon yesterday and told them that I had an installation that needed urgent work and I needed the supply isolated prior to the 4th December, they said they couldn't do it until the new year but if the house owner called they may be able sort something out. I told them that if they didn't turn up prior to me attending I would pull the fuse to comply with the electricity at work regulations. My customer then called them and they said to him that if your electrician feels it necessary to pull the fuse then tell him to go ahead and do it!?:)
I fully agree with that their apparent waiting times are ridiculous I would be removing it if they couldn't make the appointment especially when it's 2 weeks away. How can they possibly spare one of their goons for 5 minutes to remove a fuse. Takes him longer to put on his protective professional fuse pulling gear
 
I love the marigolds they put on.and the helmets with visors has well .
you swear that they coming to collect monies for matt brinks .
 
have got a pair of the proper gloves, I have a welding helmet I suppose I could use but can't see anything through it
you would see a big spark in them !
 
the suppliers changing to smart meters should put in a isolator for next time anybody wants to up grade the c/u or add.
 
is it not the government paying for the smarties to go in
 
They often seem to put in very short new tails from the meter then fit 100a single pole blocks to connect to the existing tails, so space permitting it would be no more time consuming to just fit an isolator.
 
next time get your customer to arrange it for isolator to be put in .if not pull the bl**dy fuse. the last time I changed the consumer unit
the suppler turned up to pull the fuse he put on his bomb proof suit to pull the fuse .what!
Was it me.:)
 
It's ok making fun of dno and supply operatives using ppe, but remember you are quite possibly on a circuit controlled by a 400 or 500 amp fuse. I worked for dno, all clothing is arc resistant, code of practice states that when working on live circuits you wear full boiler suit, full gace mask, rubber gauntlets with leather over gauntlets. Now I admit on most cut-outs in good condition you didn't do this, but any signs of damage or distress to switch gear you certainly did. It's a hell of a bang and a flash if it does fault! In LV sub stations it was a sackable offence not to wear full ppe, lots of bare 3 phase bus-bars etc. Actually, if the cut-out or meter seals were missing we would look for any other signs of illegal interference and if non found ignore it.
 
With the new generation (2) of smart meters being installed, that can be transferred between suppliers it would have been a good idea to have the self-connect isolator on the meter as I have come across with E-ON I think.
 
Smart meters with isolators would have been a good idea, and they were included in the earlier designs but the idea was scrapped because it added an 'unnecessary' cost.
 
is it not the government paying for the smarties to go in

NO, it's you me and all the other Domestic energy users.
Either by increased energy charges or fee for the meter.

Don't be fooled by the energy suppliers saying "Free Smart meter", the cost still comes back to the user.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Msitekkie

Arms
~
Joined
Location
Essex
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Practising Electrician (Qualified - Domestic or Commercial etc)

Thread Information

Title
Bad experience having isolator switch fitted by Scottish Power/Actavo
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
29

Advert

Thread statistics

Created
Msitekkie,
Last reply from
snowhead,
Replies
29
Views
13,461

Advert