- Reaction score
- 2
Hello all, new to the forum and everyone seems to be quite frendly and happy to help out. So.. i have my am2 in a few weeks and am pretty gemmed up on everything but there are a few things bothering me. And have checked all forums regarding am2 prep and can't seem to find anything.
1.When installing the FP200 cable supplying the carbon monoxide sensor, is this glanded and terminated as this video demonstrates? Ive never worked with this before.
2. After completion of inspection and testing, do you need to compare the results to all the maximum measured values from bs7671 for each test and illustrate what table you got it from etc.
3. Main bonding. Do you have to run 2x 10mm2 earth cables to both gas and water pipes or can you just use one bridge from one pipe to the other using earth clamps.
Thanks in advance ☺
1.When installing the FP200 cable supplying the carbon monoxide sensor, is this glanded and terminated as this video demonstrates? Ive never worked with this before.
2. After completion of inspection and testing, do you need to compare the results to all the maximum measured values from bs7671 for each test and illustrate what table you got it from etc.
3. Main bonding. Do you have to run 2x 10mm2 earth cables to both gas and water pipes or can you just use one bridge from one pipe to the other using earth clamps.
Thanks in advance ☺