Thewiz
Hi all....
Was talking to my mate last not and he is doing a job this week were he is removing an existing supply witch feeds 3x single phase consumer units....
Well the supply is being moved by DNO. He said he is going to install 3x switch fuses..
I said why not install a consumer unit with 3x MCB rated accordingly. Eg..
He said no that's not to correct way of doing things. Wat do you all think. Surly the way I suggest was neater and carries greater protection?
Was talking to my mate last not and he is doing a job this week were he is removing an existing supply witch feeds 3x single phase consumer units....
Well the supply is being moved by DNO. He said he is going to install 3x switch fuses..
I said why not install a consumer unit with 3x MCB rated accordingly. Eg..
He said no that's not to correct way of doing things. Wat do you all think. Surly the way I suggest was neater and carries greater protection?