K

Krwz89’s

Is this appropriate if off a ring final circuit and would testing just require testing the new cable installed. Both required for separate fixed Paxton access control unit boxes
 
I think some more detail/clarity of exactly what you mean would be useful.
 
Is this appropriate if off a ring final circuit and would testing just require testing the new cable installed. Both required for separate fixed Paxton access control unit boxes
A bit more of a detailed explanation of what your intentions are Mate would help considerably
 
am i right in thinking you mean RFC> 13 AMP FCU > sockets or just 2.5 Twin and Earth then another 13 AMP FCU??
Personally I have used a 13 amp rcd fcu recently to add a spur for an extra socket on a rfc and also then a fcu of this spur with 5 amp fuse for a 1kw heater in a small room that was once the downstairs toilet. there were no rcds present so it provided the easiest way to acheive the desired outcome.
 
  • Like
Reactions: Krwz89’s
Still waiting for a reply here, if you ask a question please see the thread through, I have no intention to be sarcastic or nasty, but you asked a question, and have not been back since.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Fsu load to 2nd fsu supply in 2.5
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
5

Advert

Thread statistics

Created
Krwz89’s,
Last reply from
MDJ,
Replies
5
Views
851

Advert