Is this appropriate if off a ring final circuit and would testing just require testing the new cable installed. Both required for separate fixed Paxton access control unit boxes
 
I think some more detail/clarity of exactly what you mean would be useful.
 
Is this appropriate if off a ring final circuit and would testing just require testing the new cable installed. Both required for separate fixed Paxton access control unit boxes
A bit more of a detailed explanation of what your intentions are Mate would help considerably
 
am i right in thinking you mean RFC> 13 AMP FCU > sockets or just 2.5 Twin and Earth then another 13 AMP FCU??
Personally I have used a 13 amp rcd fcu recently to add a spur for an extra socket on a rfc and also then a fcu of this spur with 5 amp fuse for a 1kw heater in a small room that was once the downstairs toilet. there were no rcds present so it provided the easiest way to acheive the desired outcome.
 
  • Like
Reactions: Krwz89’s
Still waiting for a reply here, if you ask a question please see the thread through, I have no intention to be sarcastic or nasty, but you asked a question, and have not been back since.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread Information

Title
Fsu load to 2nd fsu supply in 2.5
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
5

Advert

Thread statistics

Created
Krwz89’s,
Last reply from
MDJ,
Replies
5
Views
851

Advert