This paper was used for my last exam which i did fail, then did another paper and passed, would would love to have correct answers to these please.
I have put the questions and below i have put how many marks the question is worth.
I need your help on this please.:)


1) A low resistance ohm-meter is belived to be giving incorrect readings. State

A) two methods which could be used to verifiy the accuracy of the instrument

B) the action to be taken if the meter is found to be inaccurate

( 6 Marks)

2) State three activities which require a FULL ELECTRICAL installation certificate?

( 6 Marks)

3) State the:
A) three forums which must be completed following the installation of a new circuit?
B) Person who is responsible for deciding the date of the next test on the forms in a)
C) person to who the forums are given

( 6 Marks)

4) the value of resistance of a earth electrode used on a TT system is be measured using an earth loop impedance test instrument. State:
A) Why isit necessary to isolate installtion before testing
B) What action is to be taken with the earthing conductor before testing and why?
C) why the earth loop reading can be recorded as the electrode value?

( 6 Marks)

5) An electrician is carry out work on a three line and neutral installation, Forming part of a TN-S system. List all points that should be tested between to ensure the installation is totally DEAD.

( 6 Marks)

6) When carrying out a visual inspection prior to commissioning of an installation, identify three possible faults which could be identified at:
A)A pendant type luminaire with 2 plate wiring
B) a consumer unit

( 6 Marks)

7) List the test instruments used and typical measurement range for the following TESTS.
A) Continuity of protective conductors for the ring final circuit.
B) Insulation resistance test at a distribution board
C) Polarity test on lighting circuit

( 6 Marks)

8) Electrical operatives working on site for a number of weeks need special faciilities for tools and equipment: STATE
A) Suitable storage methods for tools and heavy equipment
B) What precautions should be taken with materials on site

( 6 Markks)

9) state three methods of procedures necessary to make an area safe before starting work.

( 6 Marks)


I hope to get answers to these as i have tried but have failed. Also, People doing there 2330 level 3, Get these answers, i am sure this will be useful to you too.
 
This paper was used for my last exam which i did fail, then did another paper and passed, would would love to have correct answers to these please.
I have put the questions and below i have put how many marks the question is worth.
I need your help on this please.:)


1) A low resistance ohm-meter is belived to be giving incorrect readings. State

A) two methods which could be used to verifiy the accuracy of the instrument

Prove on a check box
Prove on a known resistor

B) the action to be taken if the meter is found to be inaccurate

Have it calibrated

( 6 Marks)

2) State three activities which require a FULL ELECTRICAL installation certificate?

Addition
Alteration
New installation

( 6 Marks)

3) State the:
A) three forums which must be completed following the installation of a new circuit?

Electrical installation certificate

B) Person who is responsible for deciding the date of the next test on the forms in a)

The designer

C) person to who the forums are given

The client

( 6 Marks)

4) the value of resistance of a earth electrode used on a TT system is be measured using an earth loop impedance test instrument. State:
A) Why isit necessary to isolate installtion before testing

The installation will be disconnected from the main earth

B) What action is to be taken with the earthing conductor before testing and why?

C) why the earth loop reading can be recorded as the electrode value?

( 6 Marks)

5) An electrician is carry out work on a three line and neutral installation, Forming part of a TN-S system. List all points that should be tested between to ensure the installation is totally DEAD.

L1-L2 L1-L3 L2-L3 L1-N L2-N L3-N L1-E L2-E L3-E N-E

( 6 Marks)

6) When carrying out a visual inspection prior to commissioning of an installation, identify three possible faults which could be identified at:
A)A pendant type luminaire with 2 plate wiring

No sleeve on cpc
Switched line incorrectly coloured
Outer sheath of flex not inside rose

B) a consumer unit

Open holes on top horizontal surface
Blanking pieces missing
Not labeled

( 6 Marks)

7) List the test instruments used and typical measurement range for the following TESTS.
A) Continuity of protective conductors for the ring final circuit.

Low resistance ohm meter

B) Insulation resistance test at a distribution board

Insulation resistance tester

C) Polarity test on lighting circuit

Approved voltage tester

( 6 Marks)

8) Electrical operatives working on site for a number of weeks need special faciilities for tools and equipment: STATE
A) Suitable storage methods for tools and heavy equipment

Lockable container

B) What precautions should be taken with materials on site

Tools locked away to prevent unauthorised use

( 6 Markks)

9) state three methods of procedures necessary to make an area safe before starting work.

Clearing the area of any trip hazards etc

( 6 Marks)


I hope to get answers to these as i have tried but have failed. Also, People doing there 2330 level 3, Get these answers, i am sure this will be useful to you too.

Hope this helps
 
This paper was used for my last exam which i did fail, then did another paper and passed, would would love to have correct answers to these please.
I have put the questions and below i have put how many marks the question is worth.
I need your help on this please.:)


1) A low resistance ohm-meter is belived to be giving incorrect readings. State

A) two methods which could be used to verifiy the accuracy of the instrument Calibration checks against known values ie check box

B) the action to be taken if the meter is found to be inaccurate send away for re calibration/ repair

( 6 Marks)

2) State three activities which require a FULL ELECTRICAL installation certificate? a new curcuit ie a new shower being fitted, a board change, a complete re-wire

( 6 Marks)

3) State the:
A) three forums which must be completed following the installation of a new circuit? eic to includeschedule of inspections, schedule of test results,
B) Person who is responsible for deciding the date of the next test on the forms in a)the designer
C) person to who the forums are giventhe person ordering the work

( 6 Marks)
 
Last edited by a moderator:
4) the value of resistance of a earth electrode used on a TT system is be measured using an earth loop impedance test instrument. State:
A) Why isit necessary to isolate installtion before testing

The installation will be disconnected from the main earth

B) What action is to be taken with the earthing conductor before testing and why?

C) why the earth loop reading can be recorded as the electrode value?


What are the answer to B and C??
thanks
 
4) the value of resistance of a earth electrode used on a TT system is be measured using an earth loop impedance test instrument. State:
A) Why isit necessary to isolate installtion before testing

The installation will be disconnected from the main earth

B) What action is to be taken with the earthing conductor before testing and why?

Earthing conductor must be disconnected from MET so you only test the electrode and not introduce parallel paths.

C) why the earth loop reading can be recorded as the electrode value?

The true value of resistance of the electrode would be a dc resistance measurement but the impedance reading using a loop tester ac is acceptible as the difference is minimal.


What are the answer to B and C??
thanks


Try these
 
Could you please also try these??

Questions 1) A six way consumer unit has five circuits connected to it, the sixth way is left as a spare. An insulation resistance test carried out on the individual circuits (L-N to earth) produces the following results:

Way - 1, 2, 3, 4, 5, 6
Megohm - 60, 20, 10, 60, 60, spare
 
a) Determine the overall value of insulation resistance if all circuits were tested together. Show or explain your working.

b) State the effect on the overall value of connecting an additional circuit to way 6 in the board.
 
12) Calculate the size of metal conduit required to contain 6x6mm2 single core pvc insulated cables. The total lenght of the conduit run is 10 metres but there is a draw in box exactly half way along the conduit run. There are two bends either side of the draw in box (4 bends in total). Show all working.
 
13a) A single phase load of 30 amperes is supplied by 6mm2 single core 70oc thermoplastic pvc cables in conduit and trunking. If the cable is 24 metres long, calculate the circuit voltage drop.

b) If the above cable is subjected to a fault current of 125 A which causes disconnection in 5 seconds, what is the minimum size cpc which could be used.
 
15) Draw a fully labelled earth fault loop impedance path for a TN-C-S system for a fault on a fized load within the installation.

16) Draw the layout of a domestic intake position from the supply authority cut out to the consumer unit. Include all live conductors correctly identified in their appropriate positions.
 

Reply to Need answer to these questions - 2330-302 in the Electrician Courses : Electrical Quals area at ElectriciansForums.net

Similar Threads

Hello All. I am taking my 2396 written exam in December this year, therefore i am knee deep in practice papers. In case anyone else is in the...
Replies
8
Views
1K
I have got these questions on 2391-52 inspection and testing but can't remember option of 1st two questions. Please any suggestion will be...
Replies
2
Views
714
Refurbishment of dwelling has taken place and the clients insurance company requires a periodic inspection and test to be carried out, A new...
Replies
18
Views
1K
I want to check the insulation of the 3-phase 400VAC asynchronous squirrel cage motor. Motor's stator windings are connected in delta. I've read...
Replies
10
Views
2K
Hi All I would appreciate some help with a few questions here regarding cables sizing, I'm using the latest 18th edition, amendment 2. Q1...
Replies
0
Views
926

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

Electrical Courses

This is the main Electrical Courses at ElectriciansForums.net. Find local recommended electricians courses. Avoid training "company" scams. Always go view the training centre before booking any electrical courses.
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock