A

Adrian Sadler

Hiya

From a 3 phase board i have pulled a submain in to feed a 6 way single phase board and wired my final circuits from there.

But i have also wired a single radial to feed a socket from the 3 phase board via a rcbo.

How do you cater for this lot on test sheets?

Would you do a install cert with 2 schedules of results, one for each board? Or would it be 3 schedules? One for the submain to cu, one for the final circuits from the new cu and one for the radial from the existing cu?

Help.........

Cheers
 
Two Certs. One with sub circuit and socket on and other cert for the final circuits on sub board.
 
One for the additions to the 3 phase cu (submain and radial)

Other for the new consumer unit?

Cheers

Edit - beat me to the edit lol
 
Last edited by a moderator:

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
2 certs one job
Prefix
N/A
Forum
Periodic Inspection Reporting & Certification
Start date
Last reply date
Replies
6

Advert

Thread statistics

Created
Adrian Sadler,
Last reply from
ipf,
Replies
6
Views
1,392

Advert