Where it says operational limations, what would go in there. Also if the circuit is using the conduit as earthing system what would you put in cpc colum on size of cable?
Would you code no earth tags at switches or sockets if it was not presant and using conduit as earth?
 
For conduit as cpc, i'd put con. in the box. Earth tags, if you mean fly leads, these are required to earth the socket terminal to the conduit. not required for switches unless they are metallic.
 
Last edited:
but if the conduit is used as cpc, then you must have a fly lead to the earth terminal on a socket, surely.
 
ahh, see what you mean. as the op was referring to accessory outlets, i assumed he meant fly leads, as i mentioned in post #2.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Condition report
Prefix
N/A
Forum
Periodic Inspection Reporting & Certification
Start date
Last reply date
Replies
6

Thread Tags

Tags Tags
condition

Advert

Thread statistics

Created
aaelectric,
Last reply from
aaelectric,
Replies
6
Views
1,501

Advert