Installation figures released by DECC this morning would suggest another 3.5% digression in the FIT on July 1st.

According to the DECC installation figures released this morning the total installations in the Jan - Mar 2015 period for the 0 - 10kW band were 103MWp which should result in another 3.5% digression in the FIT tariff on July 1st.This will be the 3rd 3.5% quarterly reduction in a row and coming at a time of rising prices will start to have an impact on the return on investment for home owners.

If previous trends are repeated then the industry can expect another boom month in June leading up to the cut on the 1st July.
Over 52MWp was installed in the >50kW band so there will also be a 3.5% cut in that tariff rate on July 1st. With only 21MWp installed in the 10kW - 50kW band there will be no change in the FIT for that band.
 
is that right for the 10-50kWp band? When was the last degression for that band?
 
Please do not get too gloomy about cuts in the 0-10kw band. DECC have virtually accused the industry of not doing enough in terms of installations causing returns to be too high and outside the Control Levy Framework limits. Orderly degression using the existing mechanism designed to control the budget is no bad thing . It reduces the possibility of a significant cut as a result of the FITs review in the autumn.

Yes, we will get another rush, but come on it is only 3.5%. This is not enough to stop PV being a no brainer if you have a suitable roof. I always tell prospects not to be pressured and show the true effect of such a cut - less than four pints of beer a year. Panel prices are still falling, so things should balance out.
 
  • Like
Reactions: 2 people
I don't see it as a bad thing at all, we 3.5% every quarter isn't a massive problem for the 0-10kWp band.

I have more of an issue with the bigger systems due to the delays in grid connection permission etc.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread starter

whinmoor

Arms
~
Joined
Location
Wakefield/Leeds, West Yorkshire
Website
http://www.medoriasolar.co.uk
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Electrical Engineer (Qualified)
Business Name
Medoria Solar

Thread Information

Title
FIT cut for July 1st
Prefix
N/A
Forum
Solar PV Forum | Solar Panels Forum
Start date
Last reply date
Replies
4

Thread Tags

Tags Tags
fit

Advert

Thread statistics

Created
whinmoor,
Last reply from
Gavin A,
Replies
4
Views
1,742

Advert