B
bobby101
hi all doing a nightmare job an its the boss's 2nd house revamp job i first thought the job would be ok..., some light here there move a socket ya de ya ...... no i was so wrong ground floor now comprises of 50 spot fittings 1st floor will have an additional 40 spots effing yeha (sarcastic me ... ) my workings estimate 20 amps for lights
1.st question diversity ...... pls explain the 100w rule .....and why 100 watt
the original wiring comprises of at least 3 junction boxes, mid section of house NIGHTMARE (old school wiring) (ps. would this type of wiring pass an inspection due to the fact of looped neutrals jus wondering for future ref....
next situation boss wants 2 yes 2 showers wired min 8.4 load
2nd question. is this allowed and again diversity
please put in mind ths is a standard tncs system 100a supply
still to have massive kitchen 2b agreed. .....
help....
oh an best bit kitchen has now been plastered ha ha ha .........
1.st question diversity ...... pls explain the 100w rule .....and why 100 watt
the original wiring comprises of at least 3 junction boxes, mid section of house NIGHTMARE (old school wiring) (ps. would this type of wiring pass an inspection due to the fact of looped neutrals jus wondering for future ref....
next situation boss wants 2 yes 2 showers wired min 8.4 load
2nd question. is this allowed and again diversity
please put in mind ths is a standard tncs system 100a supply
still to have massive kitchen 2b agreed. .....
help....
oh an best bit kitchen has now been plastered ha ha ha .........