Hi guys,
Just wondering if anyone can help on a matter. I recently posted on here regarding non presence of existing supplementary bonding in a bathroom when working on an exisitng upstairs lighting circuit with no rcd, for example adding an extra light on the landing, and not touching the bathroom
I asked was it necessary to provide supplementary bonding even though I had not worked in the bathroom, as I was told by a work mate that as I worked on the circuit, I take responsibility for the whole circuit, the general opinion was no, as was mine but I have read in the regs (BYB) regarding
additions and alterations 132.16: no additions and alterations, temp or perm, shall be made to an existing install, unless it has been ascertained that the rating and condition or existing equipment, including that of the distributor, will be adequate for the altered circumstances. Furthermore, earthing and bonding arrangements, if necessary for the protective measure applied for the safety of the addition or alteration, shall be adequate.
Now as far as I am concerned you are only responsible for your own work, so lets say an extra light was added from an existing landing light, not needing an rcd as wiring was surface in the loft, and main bonding was adequate and present, your work would rely on the main earthing conductor, the main bonds and the cpc in the circuit you are adding from, you would inspect and test the addition and note on the cert no presence of supplementary bonding in bathroom and hand over certificate, as at the end it stated earthing and bonding to be adequate for the addition or alteration, and as I see it the extra light would not rely on the supplementary bonding, as that is concerned with the bathroom, that has not been touched.
But, I have read in the OSG Page 84 7.8 the same statement, but it says at the end:
where the addition or alteration is to an existing circuit, so far as reasonably practical, the installer/ designer takes responsibility for the circuit, not just the small addition/ alteration they are undertaking.
My question is from reading that in the OSG if that is the case would you need to install supplementary bonding in the bathroom to the circuit in question, if not on rcd and you was only adding a light in the landing, as it seems it is implying you do infact take responsibility for the whole circuit, (which is what I think my work mate was getting at). Which seems weird as when testing you state the addition/ alteration and test to that point that you have added.
Just wondering if anyone can clear this as I think I may have mis read/ misunderstood the regulation and obviously want to be carrying out additions and alterations in the correct way,as most of my work is new, and looking at carrying out a few additions and alterations in the future and want it to be right, and was always told you test and are responsible for what you do so now starting to doubt myself, and looking for others opinion.

Thanks for any help and sorry for the long post.



Regards

and happy new year to you all.
 
Looking to get others opinions:

adding a light to existing upstairs lighting circuit, No RCD, No Supplemaentary bonds to Bathroom, Main Bonds to gas and water, main earth present.



If adding a light to the said existing lighting circuit in a bedroom or landing for example, and the cables don't need RCD protection,i.e surface clipped in loft can you note on cert no Supplementary bond present.

I think yes as you are not working/ touching the bathroom at all, but work mate says no, you need to add supplementary bonding to the bathroom as you are taking responsibility for the whole circuit, or provide RCD protection.



Looking at Reg 132.16 I think the way it is worded is in agreement to what I say as it says that the equipment, earthing and bonding needs to be adequate for the addition/alteration. ie. Extra light in loft, bedroom, landing. So Main earth present and correct, main bond to gas and water ( and / or other extranious conductive parts) present and correct and the cpc in the lighting circuit Is present. Note on cert no supplementary bonding (as this is to do with the bathroom) and issue.

In the OSG it says the same but at the bottom it says that so far as reasonably practical the installer/ designer takes responsibility for the whole circuit not just the addition/ alteration. So would that warrant to what my work mate was saying that supplementary bonding is needed or RCD protection as he thinks you take responsibility for the whole circuit.



Just looking for others opinions in this subject. as I think I am mis reading/ misunderstanding what is wrote.



Sorry for the long posts and I hope this is a bit more understandable.



Cheers
 

Reply to Opinions on a post card in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Been asked to move, remove and add some sockets the kitchen and I’ll need to add a circuit for an electric hob. Looked at the board and it’s one...
Replies
17
Views
695
Hi all, I am looking for some advice regarding old rewireable (3036) fuse boards in regards to additions and alterations. I am an electrician and...
Replies
28
Views
4K
Hi All, Would be grateful for some advice. Would like to add an additional light (Undercabinet 8W LED Batten light) to a two-way light switch...
Replies
7
Views
613
  • Question
Hi there, I’m a new member to the forum and felt like I could do with some additional insight into a fault I came across on a call-out at the...
Replies
6
Views
465
Hi guys, Been asked to fit 2 lights and a switch, which in reality turned out to be rewiring a multiple PIR setup to a single switch, adding...
Replies
0
Views
843

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock