There's nothing structurally preventing proper wet UFH being installed, thats just money, effort and time - perhaps the disruption and need to have it all in with 2 months makes doing the job properly unrealistic.
How do you know that there's nothing structurally preventing it? With the age of the building there may be very limited foundations which may then require underpinning before the floors can be dug out far enough to get a concrete slab cast to then get a thick enough insulation layer down.