Hi all,
Long term lurker first time poster here, on the cards electrician.
Just looking for a little advice on installing 4 extra sockets and led down lights in a kitchen extention.
Would this work be notifiable if both were installed off of existing circuits? Or would a minor works for each suffice.
If notifiable LABC require £300 for the privialage, so joining ELECSA is cheaper.
If I do decide to go down the elecsa route, could i use this job for the assement or does it need to be a job which i have already previously notified LABC about?
Cheers
Long term lurker first time poster here, on the cards electrician.
Just looking for a little advice on installing 4 extra sockets and led down lights in a kitchen extention.
Would this work be notifiable if both were installed off of existing circuits? Or would a minor works for each suffice.
If notifiable LABC require £300 for the privialage, so joining ELECSA is cheaper.
If I do decide to go down the elecsa route, could i use this job for the assement or does it need to be a job which i have already previously notified LABC about?