gbrock69

i have recently finished a periodic test of a fairly large castle and found that the building had no main equipotential bonding conductors. There is around 22 individual consumer units situated around the building all coming via sub main supplies from the main incoming area. Must the main bonding conductors come from the point of incoming supply or can they come from any of the individual consumer units?
 
As long as you have an in spec Zdb at your local consumer units there should be relevant equipotential bonds run from these DB's to associated services/metalwork etc as there should be from the local DB to the point of origin.

Hope this helps

BillR3
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
main bonding conductors
Prefix
N/A
Forum
Periodic Inspection Reporting & Certification
Start date
Last reply date
Replies
2

Advert

Thread statistics

Created
gbrock69,
Last reply from
wayne,
Replies
2
Views
2,194

Advert