R
Rayelect
Can anyone tell me if you still require main earth bond to the incoming mains water. All the pipework and central heating is plastic (except 1m of copper from combi on water and central heating). The boiler is about 5m away from incomming mains. Also the mains is a minimum of 5m of plastic MDPE to stop cock?
If this is required where do you clamp as it is all plastic except for a small bit under boiler.?
If this is required where do you clamp as it is all plastic except for a small bit under boiler.?