Discuss Schedule of Test.... are any mandatory? in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Reaction score
14
I was asked which tests during a Schedule of test on a new building and then on an in use building were mandatory.
Where ever I look in the few regs books I have with me they say where "relevant" or "recommended" not will be or shall be done!

So,..... R2 test mandatory or if you feel like it, same with Insulation Testing, is it down to how you feel on the day ?!

Anyone have an Approved reference they can point me towards that says this test WILL BE DONE ?

Thanks
 
on a new build, do all the tests as laid out on the SOTR. for an existing installation, testing is limited to what you and the client agree on. obviously, the more N/Vs you put on an EICR, the less value the document has.
 
But what about a building 10 years old, and where does it say YOU WILL !

Make up your own cert and have titles like 'Light switch works'.....
That would then be an EICR, you discuss with the client how far the testing will go and explain this on the pages when it asks for clarification of what has been agreed.
 
all down to how big your writing is, and how much you can fit on the back of a beermat. (or smoke packet for the teetotallers).
 
But what about a building 10 years old, and where does it say YOU WILL !

Make up your own cert and have titles like 'Light switch works'.....

Eh? It doesn't matter how old the building is. If you are doing an actual job then you will be issuing a cert with a schedule of tests, which must be done or else how can you issue it? As for an EICR on such an installation, well I personally test 100% of circuits, again I couldn't fill out the EICR without doing so!
 
on a new build, do all the tests as laid out on the SOTR. for an existing installation, testing is limited to what you and the client agree on. obviously, the more N/Vs you put on an EICR, the less value the document has.

I said that the SOTR in the Regs would be the minimum required but I can't find anywhere where it states THESE are the minimum that YOU MUST do, all I could find was "Recommended"!!
 
Eh? It doesn't matter how old the building is. If you are doing an actual job then you will be issuing a cert with a schedule of tests, which must be done or else how can you issue it? As for an EICR on such an installation, well I personally test 100% of circuits, again I couldn't fill out the EICR without doing so!
Totally agree 100%, however that said sometimes the installation will be a problem and Lims may have to be considered, but yep agree agree fella
 
Eh? It doesn't matter how old the building is. If you are doing an actual job then you will be issuing a cert with a schedule of tests, which must be done or else how can you issue it? As for an EICR on such an installation, well I personally test 100% of circuits, again I couldn't fill out the EICR without doing so!

But where does it say this is the minimum that YOU WILL do? All I've found is recommended !
So it does tie up under an agreement with the client as you complete the EICR.

I just thought that Testing would have a minimum number of tests 'written-in-stone' that YOU WILL do.

I've always done the Testing to the Schedule printed in the BGB and I supposed I realy just followed blindly
 
Kingeri I agree as has been said start assuming all tests will be done on all circuits,

however....sometimes this isn't possible. Especially in a commercial situation, as i am sure you are aware! Sometimes the agreement is just live tests as powering down just isn't possible. Like in a 24/7 truck company office for example.

All down to whats agreed and you are being paid to do.
 
I agree with kingeri , if you carry out all the tests as required you can sleep at night , miss them and something goes wrong , prime example young mother electrocuted in her airing cupboard, the electrical company failed to carry out the required testing , and have now been charged with unlawful killing think that answers the question
 
On a new build, ALL relevant testing of the installation should be conducted. On existing installations some of the dead testing can be omitted where it is unreasonable to power down. It is then totally down to the person conducting the inspection and testing of the installation what limitations he is prepared to forego. All such limitations normally being agreed, before any IT work being started...
 

Reply to Schedule of Test.... are any mandatory? in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

Hello, I am in the process of training to be an electrician and have a question. When filling out a EIC for a new circuit am I required to test...
Replies
2
Views
1K
Would entering each RCD as a line on the schedule of test results be correct? If so, what would be entered in boxes such as Zs?
Replies
8
Views
3K
Folks it seems that we now have Issue 7 of the BPG#4 on EICR. Trying to compare them shows only minor changes, but those of note are: Page 9...
Replies
19
Views
1K
Hi All Happy new year to all! First post but long timer lurker, so thanks for all the previous help! Just wanted to clarify something I have...
Replies
7
Views
837
For example the house today had two lighting T&E in the same MCB. I know it's fine, but as I test both 'radials' where and how do we enter them on...
Replies
6
Views
829

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock