I am going to help my father in law with getting power to his shed, but have very rarely done domestic electrical work, mainly industrial.
Going the whole SWA straight from the DB to a new DB in the shed route isn’t really feasible due to distant location of DB and pricing of materials etc.
Is it acceptable to take a non switched fused spur (13A) from the ring circuit in his house out to the sockets in his shed via 2.5mm T+E in conduit along the garden wall, to the sockets in his shed. From there spur off from the shed sockets with a non switched fused spur (3A) to the lighting within his shed, probably just two LED bulkhead type.
I know there is this whole problem with exporting PME, but there will be no extraneous conductive parts in shed as far as I am aware.
Thanks guys and sorry if I am ignorant to any regs!
Going the whole SWA straight from the DB to a new DB in the shed route isn’t really feasible due to distant location of DB and pricing of materials etc.
Is it acceptable to take a non switched fused spur (13A) from the ring circuit in his house out to the sockets in his shed via 2.5mm T+E in conduit along the garden wall, to the sockets in his shed. From there spur off from the shed sockets with a non switched fused spur (3A) to the lighting within his shed, probably just two LED bulkhead type.
I know there is this whole problem with exporting PME, but there will be no extraneous conductive parts in shed as far as I am aware.
Thanks guys and sorry if I am ignorant to any regs!