Good morning Guys
Looking for some advice with regard to a current job.
Building company I'm doing work for are installing Electric heating on a property.
Customer has no access to Gas so there are 2x 9kW Electric boilers being installed. (Plumbers and Builders recommendation).The incoming supply was initially 60amps
I made customer and company aware that the incoming supply wasn't big enough ( Electric shower and electric Cooker currently in place aswell). I advised that they would have to upgrade the fuse but that the maximum was 100 Amp for a domestic property.
I was then told that the fuse was upgraded and the works have now begun. The main Fuse sticker is showing 100Amp.(So I'm presuming that's what been installed) When I arrived on site I noticed the boilers were 9kW and made a calculation of around 78 Amps on full load. The manufacturer informed me both boilers won't run together initially at same time. Only one will come on initially and then once heat has reached the other will kick in.
So my question is, I'm a bit worried about the maximum demand. And where do I stand in terms of the installer.
Has anyone been on this situation before
Many Thanks
Looking for some advice with regard to a current job.
Building company I'm doing work for are installing Electric heating on a property.
Customer has no access to Gas so there are 2x 9kW Electric boilers being installed. (Plumbers and Builders recommendation).The incoming supply was initially 60amps
I made customer and company aware that the incoming supply wasn't big enough ( Electric shower and electric Cooker currently in place aswell). I advised that they would have to upgrade the fuse but that the maximum was 100 Amp for a domestic property.
I was then told that the fuse was upgraded and the works have now begun. The main Fuse sticker is showing 100Amp.(So I'm presuming that's what been installed) When I arrived on site I noticed the boilers were 9kW and made a calculation of around 78 Amps on full load. The manufacturer informed me both boilers won't run together initially at same time. Only one will come on initially and then once heat has reached the other will kick in.
So my question is, I'm a bit worried about the maximum demand. And where do I stand in terms of the installer.
Has anyone been on this situation before
Many Thanks