Thanks everyone starts at 8 oclock tommorow Morning and find out my result on Wednesday Night at 8 pm! Gonna be scared to check my email for my results
 
  • Friendly
Reactions: ruston
Keep hydrated , no big meals before the exam, bit hard that time of morning though, but don't overload your stomach.
And if there is a written element RTBQ (read the bloody question) properly . ;)
 
  • Like
Reactions: DPG and RyanF
Keep hydrated , no big meals before the exam, bit hard that time of morning though, but don't overload your stomach.
And if there is a written element RTBQ (read the bloody question) properly . ;)

I always have a smsll breakfast before any big exam or test like poridge and bananas. Have you got any last minute quick tips for the exam?
 
Well you have just said it with the bananas, they are brain food.
Ross Braun on the F1 pit during the race always ate bananas when they had to think on their feet.
 
  • Like
Reactions: RyanF
How did it go?

To be honest not as bad as I thought. Ive got 3 hours left on my install to do the S plan and data points. All other cables/ circuits are terminated and connected. I still need to check the conductors and fixing etc against the spec.

Then on to inspection and testing / fault finding tomorow.

Would I loose marks if I use the wrong size crimps on the cpc for the swa banjo etc? Not really good with using crimps.
 
  • Like
Reactions: Simonslimline
Aslog as it makes a good connection and is done correctly probily not. That been said a friend of mine failed his install part of the am2 due to using 1mm fly leads on the metal back boxes so who knows.
 
To be honest not as bad as I thought. Ive got 3 hours left on my install to do the S plan and data points. All other cables/ circuits are terminated and connected. I still need to check the conductors and fixing etc against the spec.

Then on to inspection and testing / fault finding tomorow.

Would I loose marks if I use the wrong size crimps on the cpc for the swa banjo etc? Not really good with using crimps.

So are you able to stop the install midway through and carry on the next day?

Sounds like your doing good time
 
  • Like
Reactions: RyanF
So are you able to stop the install midway through and carry on the next day?

Sounds like your doing good time

Yeah you get a total of 8 hours I believe so I cant do that over one day. So I try and get most of it done in one day then the other day is the remaining time along with the other timed units etc.
 
  • Like
Reactions: ruston and gazdkw82
To be honest not as bad as I thought. Ive got 3 hours left on my install to do the S plan and data points. All other cables/ circuits are terminated and connected. I still need to check the conductors and fixing etc against the spec.

Then on to inspection and testing / fault finding tomorow.

Would I loose marks if I use the wrong size crimps on the cpc for the swa banjo etc? Not really good with using crimps.


You have loads of time left. The s plan is very simple with the diagram, just wiring by numbers.

Good luck
 
You have loads of time left. The s plan is very simple with the diagram, just wiring by numbers.

Good luck

Simon i need your help, how do you measurePEFC AND PSCC using a Megger MFT 1730 just im doing my inspection and testing soon. Like within the next 2 hours. Do you have any hints or tips for the testing, inspection and fault finding?
 
How did it go today?
 
  • Like
Reactions: DPG
Simon i need your help, how do you measurePEFC AND PSCC using a Megger MFT 1730 just im doing my inspection and testing soon. Like within the next 2 hours. Do you have any hints or tips for the testing, inspection and fault finding?


Flat out at work again today trying to finish a substation ready for yesterday, only just seen this mate.

How did it go?
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
AM2 exam is Monday Morning Need Help with PFC testing on 3 phase and rcbo testing on lightingcircuit
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
37

Advert

Thread statistics

Created
RyanF,
Last reply from
Simonslimline,
Replies
37
Views
9,109

Advert