Hello I'm new to this forum, although I've read many posts as a guest previously and I'm impressed by the general positive feedback and advice the community gives. Seeing as this is probably the most important exam I will sit, I figured I'd ask for some advice.
I've been booked on the exam (am2). I'm abit nervous about certain areas of the testing and inspection part. I'm reasonable with single phase testing, but three phase I get abit stuck.
On the exam I'm worried about three phase insulation resistance, I am planning to test the entire installation in one hit, once removing co2, light fitting and rcbo components. It's the testing of the direct on line motor/starter circuit and testing at my isolator I get confused with, these legs have to be tested presumably.
With the live testing I have to test each phase separately and only record the higher of the readings for each test?
Oh and Zs, do I have to do this live for every circuit, as it somewhat contravenes EWR to do live on some circuits. I'm aware you do it on ring main and commando socket during exam as can do without exposing conductors. If I did on radial lighting circuit, does the exam allow you to ze+r1+r2 calculation for the other circuits or do I have to do each one too? its no problem just wanted clarification.
thanks for your time reading this.
I've been booked on the exam (am2). I'm abit nervous about certain areas of the testing and inspection part. I'm reasonable with single phase testing, but three phase I get abit stuck.
On the exam I'm worried about three phase insulation resistance, I am planning to test the entire installation in one hit, once removing co2, light fitting and rcbo components. It's the testing of the direct on line motor/starter circuit and testing at my isolator I get confused with, these legs have to be tested presumably.
With the live testing I have to test each phase separately and only record the higher of the readings for each test?
Oh and Zs, do I have to do this live for every circuit, as it somewhat contravenes EWR to do live on some circuits. I'm aware you do it on ring main and commando socket during exam as can do without exposing conductors. If I did on radial lighting circuit, does the exam allow you to ze+r1+r2 calculation for the other circuits or do I have to do each one too? its no problem just wanted clarification.
thanks for your time reading this.