F
fred12
hi ..i recently had to rough out lighting in a 2 bedroom flat ..flat was orig wired in lead covered cable..flat also has flagstone floors in all except 1 rm and nice cornice in most rms..when i wired flat i ran all cables behind skirtings and facings as original ( i no 150mm from ceiling is zone but didnt want to damage cornice and decor was good and client didnt want to much damage ,so new switch beside facing.)building control jobsworth as since turned up and ripped job because off prescribed zones not used.i am fitting rcd board and no regs about zones.depths etc,but this was only pratical way to wire lts(fire hazard before).am i totally wrong about this