I am in a residential block of 5 flats and have been told that to have various bits of work carried out, the seals of each of the 5 meters needs to be removed. That means that each account holder of each flat has to arrange for an engineer to attend on the same day to remove the relevant seal. Does this sound correct? It sounds crazy that 5 engineers would have to visit. Is there another way for the electrician to obtain permission to do this themselves? What if for example the building had 100 flats? The electrician couldn't expect all 100 flats to coordinate seals to be removed on the same day.
Thanks!
 
I think a bit more detail is required, if you have the contract for one of the meters (the landlord supply maybe)?
Then just ask for that seal to be removed for work to be carried out and suggest to the person on the phone that the following meter numbers will have to be dealt with at the same time.
 
I assume this is something like the replacement of a multi-way cutout? And probably by a contractor as the DNO would usually be able to connect to and re-seal the meters (unless its UKPN who like to cause as much hassle as possible for everybody).
 
Hi you might have a situation where the network is owned by the BNO (building network operator), which is a network past the DNO demarcation point.
Meters owned by the energy suppliers can be imbedded within that network so technically are the ones only authorised to cut seals.
Normally in such set up you would have a red link /meter/ isolator before it terminates to the customer equipment.
The easiest option if say it was for the whole block would be to letter each tenant and get the DNO to shut down the whole supply.

But as you mention only 5 flats that might not be an option.
 
Thanks for the feedback so far, much appreciated. It sounds like a bit more detail would be helpful, so I've attached a couple of images and the detail from the electrician:

Each flat has its own meter, provided by your supplier. I need to remove the old cables that are currently supplying that meter to replace them, that can’t be done without their seals being removed.

The fuse seals are the property of the DNO, power comes from them into your meter. As with the meter seals, I cannot work on those cables without the seal being removed.

Over the years, at the hands of multiple electricians, the installation ( from the suppliers cut out to the armoured cables going to each flat) has been left in a condition that is not satisfactory. We intend to fix it.

To do so, we around need to run new 25mm tails to each isolator, replace the isolators and replace the trunking in which all of this is contained. This work cannot be done whilst live and would need the fuse pulled from the DNO cut out. These fuses, however, have a seal on to prevent them being removed, this would need to be done by the supplier.
 

Attachments

  • Image 1.jpeg
    421.2 KB · Views: 55
  • Image 3.jpg
    412.8 KB · Views: 52
To be honest I think you are fairly lucky to have found someone willing to take on that lot as it's a non trivial and high pressure job and involves liaising with lots of people.

As an aside this I don't think I've seen MICC terminated like this in mid-air before, and it leaves me wondering (mainly) about the earthing arrangements.
1660214273545.png
 
To be honest I think you are fairly lucky to have found someone willing to take on that lot as it's a non trivial and high pressure job and involves liaising with lots of people.

As an aside this I don't think I've seen MICC terminated like this in mid-air before, and it leaves me wondering (mainly) about the earthing arrangements.
View attachment 100331

It's earthed in the normal way via the gland onto the metal trunking. They've just put the pot on it closer to where it connects to save stripping it back all the way to the gland and having long tails.
 

Reply to Communal Meters & Seals in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Hi, need some advice, I moved over from Sse in 2020 to Octpus energy. Whilst I was with SSE I was on E10 when I went over to octopus they put me...
Replies
1
Views
474
I really hope someone can help me. Last July I got an electricity bill showing an enormous rise in my kwh consumption of about 900% from what it...
Replies
11
Views
2K
I am organising a switchboard upgrade to my property and have recently had a smart meter installed. I am receiving conflicting information...
Replies
1
Views
792
I own a top floor tenement flat that I used to live in and then rented out after I married. It is currently empty whilst some work is being done...
Replies
0
Views
203
Hi all I don't appear to be able to post in the DIY forum so apologies if this is the wrong place. I live in a block of flats with an external...
Replies
3
Views
847

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock