Doing a EICR, and the usual limitations apply as to no lifting of floor boards ect..... also noted that im going to visually check 2 socket, 2 switches and 2 pendants on relevant circuits.
so my query is, when filling in the 'final circuits' section and 'Termination of cables' on the inspection schedule, under sections like 5.3 condition of insulation of live parts, do i put 'LIM' as im unable to verify all connections, or would i tick, if the ones i have visually inspected are fine.
Thanks
Doing a EICR, and the usual limitations apply as to no lifting of floor boards ect..... also noted that im going to visually check 2 socket, 2 switches and 2 pendants on relevant circuits.
so my query is, when filling in the 'final circuits' section and 'Termination of cables' on the inspection schedule, under sections like 5.3 condition of insulation of live parts, do i put 'LIM' as im unable to verify all connections, or would i tick, if the ones i have visually inspected are fine.