- Reaction score
- 1
Hi All,
I’m looking for a bit of advice with regards to a clients outdoor workshops.
Would the diagram attached be a acceptable method of installation? One supply from the house into a DB (RCD protected Garage unit) in the first workshop then a supply from there into the second workshop with DB and both with a TT earthing system (DNO is TNC-S supply)
I’m looking for a bit of advice with regards to a clients outdoor workshops.
Would the diagram attached be a acceptable method of installation? One supply from the house into a DB (RCD protected Garage unit) in the first workshop then a supply from there into the second workshop with DB and both with a TT earthing system (DNO is TNC-S supply)