Hi all first post on this forum,would like some advice I am just changing some light fittings in a 60/70s bungalow and the lighting circuit is wired in twin cable, the CPC for each metal light fitting is nicked locally from various JBs throughout the loft, I imagine I will be fitting class 1 light fittings. I dont like this arrangement because the lighting circuit earthing relies on other circuits which could be altered or removed during future works. I am pushing to rewire the lighting with a minimum of adding a CPC to lighting circuit alongside the twin in 4mm2.

Am I looking at this the right way?

Cheers
 
hello sam400
you have the right idea pushing for a rewire as this is what i would suggest but you can always do a long lead cpc test to see if the cpc is continuous to the db
bu also why are you rewiring it in 4mm
 
nope. it's because the min. size for a separate cpc, unprotected, is 4mm. forget the reg.
 
  • Like
Reactions: 1 person
I think you mean run a 4mm earth as the cpc along the twin which is already in place. But consider that if you have the ability to do this, then it may just be worth while running an actual 1/1.5 t&e any way, even if it's just for the loop in loop out.
 
  • Like
Reactions: 2 people

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
lighting circuit Query
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
4

Advert

Thread statistics

Created
sam400,
Last reply from
Scornio,
Replies
4
Views
1,808

Advert