Discuss Method statement on a PIR in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

M

MWG1019

I have been asked to produce 3 method statements for work we do by our grim reaper Health and safety officer. One for work carried out on fuseboards, one for installation work we do (Domestic wiring in houses, flats etc), these 2 I have done, but the third one is for Inspection and testing. Having to go through the whole process of testing a property is fine..... but to have to write that process down is ridiculous. I was wondering if anyone knows of any online examples there are for it. Something I maybe able to cut and paste? Or may be just print off and write, See attached sheet.
 
Thanx BlueSparx. I couldn't get it from your hyperlink but I just googled Langston Jones and found the method statement. I thought i was gonna have to describe each test but after reading that, it's not the case. Once again, Thanks
 

Reply to Method statement on a PIR in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

For example the house today had two lighting T&E in the same MCB. I know it's fine, but as I test both 'radials' where and how do we enter them on...
Replies
6
Views
843
Hi, Currently working my way through my NVQ portfolio (Nearing Completion) but getting stuck on how to complete the following criteria due to...
Replies
1
Views
1K
Ok so I have a quinetic switch connected to a relay which turns it into a 2way switch.. I want one output going directly to the lights and the...
Replies
3
Views
1K
Hi guys & gals, I gave in and bought the new Megger MFT-X1. Got my hands on it Friday night, had a little play with it, used it at work on Monday...
Replies
10
Views
3K
Hi everyone Ive just had an electrical condition report conducted on a mixed-use property, and I am extremely surprised that after the last report...
Replies
11
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock