Bonner
Just contact with the builder who have installed the light and in my opinions without doing experiment just call to any good electrician also.
Last edited by a moderator:
Well, both architects and environmentalists seem to like it for a number of reasons; U values, sustainability, carbon output.....oh, sorry, I forgot: You're doing projects in China.
Well, both architects and environmentalists seem to like it for a number of reasons; U values, sustainability, carbon output.....oh, sorry, I forgot: You're doing projects in China.
Plagiarist!Next they will be bringing in 'eco-plaster' made of mud and all that straw and horse-hair that goes to waste!

Of course they do, but the main reason they like them, is building cost, and how fast they can be thrown up, not necessarily the reasons you give!! Those vapour membranes, are critical!! loss of it's integrity and and rot and damp will follow. And with the timber sizes that they use these days, it wont take long to rot through!! Give me a conventional built building every single time!! lol!!
Nothing wrong with the concrete framed, block infill buildings on this project!! lol!!
Drill down into kit, then straight through both skins, including vapour barrier. Then all you need to do is cover over the hole you have made with an appropriate tape. Aluminium foil tape works, or I have also used another cloth like tape (this was more suited to a passive house type environment)
Jobs I work on come out of a factory pre-fabricated with vapour barrier already in place. And the job does get done properly!
Yes, they come with 40mm battens running vertically, cables are ran as normal through floor joists then down inside service zones. 1st fix joiners fit top and bottom runners before attaching plasterboard. The wall panels and roof panels come pre-insulated so no Kingspan in between joists.
all these posts on such a basic q from a poster that has ect
its a ****take