1/ ive bonded the incoming gas (copper) to the boiler water pipes ..(.the boiler is fed directly from the c/unit..on ..2.5mm.to a fused spur outlet.).however do i need to extend the bonding using 10mm the earth strip in the electrical meter box?
2/ in the kitchen there are 3 metal stays spanning the ceiling....to provide additional support to the ceiling/walls,,,,they are in turn bolted to some upright boxed steel to the foundations of the building....the upright sections have been plaster boarded over.....how can i bond these? do i need to? all ccts are rcd protected.
this job is for my nicie:frown2:c assessment..any advice gratefully received.
2/ in the kitchen there are 3 metal stays spanning the ceiling....to provide additional support to the ceiling/walls,,,,they are in turn bolted to some upright boxed steel to the foundations of the building....the upright sections have been plaster boarded over.....how can i bond these? do i need to? all ccts are rcd protected.
this job is for my nicie:frown2:c assessment..any advice gratefully received.